BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Oshkosh, Wisconsin. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 20, 2026, the project was awarded to Advance Construction, Inc , with an awarded amount of $376,501.25** Approx. 450 sq. yds. of 7" to 8" concrete pavement with curb and appurtenant work Approx. 1,575 sq. ft. of 4" to 6" concrete sidewalk and driveway and appurtenant work Approx. 620 sq. yds. of 4" asphaltic surface, pavement, and appurtenant work Approx. 250 lin. ft. of 6" to 24" storm sewer and appurtenant work Approx. 600 lin. ft. of 6" storm laterals and appurtenant work Approx. 100 lin. ft. of 8" sanitary sewer relay and appurtenant work Question Deadline 04/01/2026 Contractors will be notified if for any reason they are not pre-qualified upon submission of their prequalification materials and may be given an opportunity to provide additional information. Contractors will not be allowed to bid on this City Contract if complete answers to any Department of Public Works' questions or any missing documentation has not been received by the Department of Public Works by Wednesday, April 1, 2026. Sealed Bids must be accompanied by a Bid Bond payable to the City of Oshkosh on the form provided by the City of Oshkosh in an amount of not less than five percent (5%) of the total amount of the Bid as a guarantee that if the Bid is accepted, Bidder will execute and file proper Contract and Bond within ten (10) days after the award of the Contract. The Bid Bond can be presented in pdf format. If the successful bidder executes the Contract and files the necessary bonds within the allowed time, then the Bid Bond shall be released. If the successful bidder fails to execute the Contract and file the Contract Bond within the allowed time, then the Bid Bond shall be forfeited to the CITY as liquidated damages. No bids will be withdrawn for a period of sixty (60) days after the scheduled time of opening bids, except as may be allowed by law. Award will be made to the lowest responsible bidder submitting a conforming bid, unless all bids are rejected. Document Notes: Plans and Specifications may be reviewed at the office of the City Engineer, Room 301 of City Hall, beginning Tuesday, March 17, 2026. These documents are also available for inspection in the office of the City Clerk, Room 104, 215 Church Avenue, Oshkosh, Wisconsin. In addition, additional copies of the current edition of the Standard Specifications for the City of Oshkosh, Wisconsin will be available for purchase. The cost of the current edition of the Standard Specifications for the City of Oshkosh, Wisconsin will be $25 (Twenty-Five Dollars) and will be available at the City Engineer's office.

Award

Water / Sewer

$376,501.00

Public - City

Paving, Site Work

24

13

11

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

May 18, 2026

Project location map

Multiple Locations, Oshkosh, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.