BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a water / sewer project in Bentonville, Arkansas. Completed plans call for site work for a water / sewer project.

As of June 02, 2026 project was awarded to Ground Zero Construction, Inc., awarded amount is $3,743,519.10 https://govmarketnews.com/bentonville-sewer-infrastructure-project/ The city of Bentonville, Arkansas, has received a $239 million loan from a non-profit foundation to overhaul its sewer infrastructure system. The city council has already adopted a 10-year, $239 million program that will modernize its inadequate sewer system. Analyses conducted on the system’s condition determined that existing sewer infrastructure won’t have the capacity to keep pace with Bentonville’s rapidly growing population. As it stands, the transmission pipes to treatment plants are too small to contend with the city’s growth rate. With the wastewater system at its limit across the city, the loan will enable the city council to break ground on expanding capacity is critical areas. The city is expected to begin opening up the bidding process for the first of the projects supported through the $239 bond in the near future. These projects will primarily consist of: Installing transmission main extensions. Replacing wastewater pipelines. Building elevated storage tanks. Improving or building basins. Enhancing lift stations. Upgrading treatment center capacity. While a significant portion of the most critical projects have been identified, the city’s studies are still incomplete. As part of preparation for the bond program, the city conducted analyses of four out of five sewer basins to gauge their conditions and what projects are needed. In addition, only the largest pipes have been appropriately studied. Officials anticipate that the sewer infrastructure project list will expand as the city completes its analysis of essential structures. While the non-profit loan provides the $239 million over a 20-year period with a 5% interest rate, the Bentonville City Council plans to complete all projects featured in the plan over the next decade. Halving the planned schedule will ultimately save money as the city avoids inflation costs. With the sewer infrastructure in its current state, several major developments have been halted due to the lack of capacity. With the loan, these projects can get underway again, although new construction won’t be occupied until the sewer upgrades are finished. --------------------------------- The work consists of the construction of approximately 6,187 linear feet of 24-inch and 354 linear feet of 30-inch sanitary sewer interceptor improvements within the Shewmaker Basin for the City of Bentonville Water Department. The improvements involve upsizing the existing gravity sewer, replacing associated appurtenances, and performing all related work as required by the plans and specifications to ensure a complete and operational system for the City of Bentonville Water Utilities Department. Bids must be accompanied by a bid guarantee in the form of a bid bond, certified check, or cashier's check in the amount of 5% of the total bid price. Personal and company checks are not acceptable. The successful bidder will be required to provide performance and payment bonds equal to the total bid price at the time of contract signing. Bidders must adhere to the bonding requirements as specified. The City reserves the right to cancel the request, reject any bid, and waive irregularities in accordance with the City's best interest. Submission of a bid constitutes agreement to these terms. The City encourages bids from qualified small, minority-owned, and women-owned business enterprises, and encourages general contractors to consider these groups in subcontracting. Late submissions, unsigned submissions, or submissions without the required bid bond will be rejected. Question Deadline 04/03/2026 at 4:30 PM CT Deadline for questions related to this Invitation. Questions must be submitted via written communication to purchasing@bentonvillear.com. PN - 2302097

Award

Water / Sewer

$3,743,519.00

Public - City

Site Work

112

47

4

4

Subscribe For Documents

160 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
104
Bidding Soon
954
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

June 15, 2026

Project location map

Multiple Locations, Bentonville, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.