BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 20, 2026

Demolition for an educational facility in Belleville, Michigan. Completed plans call for the demolition of a educational facility.

Van Buren Public Schools will receive sealed bid proposals for Haggerty Elementary School Abatement and Building Demolition. Bids must be delivered by 1:00 p.m. on the specified date to Van Buren Public Schools, 555 W. Columbia, Belleville, MI 48111, Attention: Mr. James Williams, Director of Buildings and Grounds. Each proposal must be completed in full on the forms included in the RFP and sealed in an opaque envelope marked with the name of the bidder and the project name. No bids will be accepted at any other location or after the deadline. Bids must be accompanied by a bid security from a U.S. Treasury listed Surety Company or a cashier's check for at least five percent (5%) of the proposal sum, payable to Van Buren Public Schools. Proposals must remain firm for sixty (60) days. Oral, telephone, or fax bids will not be considered. Accepted bidders may be required to provide Performance and Payment Bonds equal to one hundred percent (100%) of the contract price. Required documents to accompany bids include a sworn and notarized statement of familial relationships, a signed and notarized statement complying with the Iran Economic Sanctions Act of 2012, a signed and notarized Criminal Background Disclosure Affidavit, and a signed and notarized Non-Collusive Affidavit. The Board of Education reserves the right to accept or reject any or all bids, to award contracts other than to the low bidder, to waive irregularities or informalities, and to make awards as deemed in the best interest of the Owner. The stated bidder agrees to provide the necessary labor and materials to perform the work as described below:. 9x9 Floor tile (Grey) - 24,500 SF 12x12 Grey Floor tile (Grey) - 3,180 SF Pipe insulation in Boiler room / Boiler Room Storage / Roof access - 550 L Fire Doors throughout - 21 doors Exterior Caulk for Doors (White) and Windows (Black) - 41 door systems and 68 windows Exterior Building Caulk (Gray) - 600 LF Pipe insulation in Tunnels - Estimated 3,150 LF Contaminated dirt in Tunnels - Estimated 640 CF 905 Fluorescent Lights with Ballasts Drain and dispose of the material within the kitchen fire suppression system Question Deadline 03/24/2026 at 2:00 PM ET All questions must be submitted no later than by . Submit any questions in writing to: jeremy.westcott@2etc.com A pre-bid meeting will be held on March 19th, 2026 at 2:00 p.m. at Haggerty Elementary School. The meeting is being held to provide a forum to answer any questions on the part of bidders. Attendance is non-mandatory, however, familiarity with site is presumed as a condition of this proposal. There will be a secondary available walkthrough on March 23rd at 1:00p.m. An additional meeting has been scheduled for March 31st at 1:00 p.m. All questions must be submitted no later than April 1st, 2026, by 5:00pm. Submit any questions in writing to: • jeremy.westcott@2etc.com

Post-Bid

Educational

$1,000,000.00

Public - City

Demolition

14

11

14

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
438
Active Projects
224
Bidding Soon
3,303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

May 1, 2026

Project location map

13770 Haggerty Rd, Belleville, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.