Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 29, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a water / sewer project in South Rockwood, Michigan. Completed plans call for the renovation of a 225-square-foot water / sewer project.
The Department of Technology, Management and Budget, in partnership with the Department of Natural Resources - Wildlife Division, seeks proposals for Phases 300 - 700 to replace the shell of a 15' x 15' light frame structure that houses electrical panels and switchgear for site dual pumps controlling the diked ponds' water level. The structural skeleton is to be retained. Work includes installing a mini-split unit, adding insulation, providing an access door, and installing adequate lighting. A $2,000 allowance for environmental testing prior to demolition is required to ensure compliance with regulations and safety standards. Materials for the shell and insulation will be discussed and finalized in consultation with the selected professional, with cost estimates expected to support decision-making and material selection for simplicity and functionality. During design, three meetings are required: a kickoff at the site, a findings/proposed plan meeting via Teams, and a final Teams meeting. Deliverables are at 50% and 100%, combining phases to match these deliverables. During construction, in addition to Pre-Bid, Pre-Construction Kick-Off, there will be three Microsoft TEAMS meetings for progress and closeout. Plans must be reviewed by the Department of Licensing and Regulatory Affairs, which will inspect work during construction. Proposal responses must be uploaded to SIGMA VSS, with the total cost for all phases entered as the bid amount. Technical and cost proposals must be combined into a single attachment for submission with a maximum size of 25mb. If issues arise with electronic submission, contact the SIGMA Help Desk for assistance and follow guidance regarding possible emailed submissions. Responses should not be emailed to the Project Director. All codes, standards, regulations, and workers' safety rules administered by federal, state, and local agencies must be followed. Question Deadline 04/02/2026 at 2:00 PM ET All questions should be emailed to Chris Bahjet at BahjetC@Michigan.gov; do not submit questions online via VSS.
Post-Bid
Water / Sewer
$60,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
