Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 25, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of a military facility in Miami, Florida. Completed plans call for the renovation of a military facility.
USDA is in need of Construction Services to furnish and install a new 100KW generator, ATS (sized to meet existing and up to 600A), Diesel Fuel Tank, and New Concrete Pad. The contractor shall provide at a minimum, the following Conduct a site visit to verify existing conditions, access constraints, utility connections, environmental factors, and proposed location for new equipment provided a new location has been identified. The contractor shall verify existing generator and ATS sizing. Provide all labor, materials, equipment, tools, supervision, and incidentals necessary to complete the work described in this Statement of Work. The contractor shall be responsible for coordinating all phases of work and minimizing impacts on ongoing facility operations. All work shall be performed in accordance with applicable federal, state, and local laws, regulations, codes, and USDA requirements. The contractor shall remove and dispose of the existing backup generator system, including the 100 kW diesel genset, automatic transfer switch, diesel fuel tank, fuel, and concrete pad, and furnish and install a new diesel-powered backup generator, automatic transfer switch, diesel fuel tank with fuel, and new concrete pad. Work includes all mechanical, electrical, piping, exhaust, grounding, control, and associated tasks needed for a complete and functional installation. The new generator must provide at least 100 kW of standby capacity, with larger-capacity units acceptable if all requirements are met. Services include supplying up to 550 gallons of fuel for startup and testing, startup and commissioning activities, equipment testing, and delivery of all submittals, shop drawings, manuals, warranties, as-built documentation, and required training. Location: Medfly Preventative Release Program Facility 16300 SW 147th Avenue, Miami, FL 33187 Submit questions to samuel.lopez@usda.gov no later than March 30, 2026, at 12:00 P.M. HST.
Post-Bid
Military
$250,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2026
June 22, 2026
16300 SW 147th Ave, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
Bid Date: May 22 2026
Miami, FL
Bid Date: Apr 21 2026
Miami, FL
Bid Date: Apr 09 2026
Miami, FL
--
Miami, FL
Bid Date: Apr 14 2026
Midway Pump Station Telemetry System Improvements and Drainage Improvements Multiple Sites - 6072083
Miami, FL
Bid Date: May 06 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed