BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

Site work for a transportation facility in Silver Springs, Nevada. Completed plans call for site work for a transportation facility.

SCHEDULE I includes lighting system upgrades, SCHEDULE II covers vault equipment, and SCHEDULE III involves electrical cables. Est. Value Notes: Probable Cost: $520,000 Any questions regarding this project are to be directed to Nadine Burgard at nburgard@hwlochner.com or the office of Lochner, Reno, Nevada, (775) 346-3010 for interpretation. Phase 1 - Schedule I Phase 1 will allow the Contractor to conduct pre-construction activities including the preconstruction meeting, mobilization, runway closure and any other necessary activities required to start construction. The Contractor will have access to Runway 6/24 and all Taxiway A connectors. Work will include relocating and adding threshold lights, replacing all edge light fixtures, PAPI and REIL units on Runway 6/24. Phase 1 will be twelve (12) Working Days. Phase 2 - Schedule I Phase 2 will allow the Contractor access to the west apron and western length of Taxiway A. Work will include removal and replacement of retroreflective edge markers. Phase 2 will be five (5) Working Days. Phase 3 - Schedule II Phase 3 will allow the Contractor access to the east apron and eastern length of Taxiway A. Work will include removal and replacement of retroreflective edge markers. Phase 3 will be three (3) Working Days Phase 4 - Schedule II Phase 4 will allow the Contractor access to the Airport Electrical Vault. Work will include removing and replacing vault equipment. Phase 4 will be five (5) Working Days. Phase 5 - Schedule III Phase 5 will allow the Contractor access to Runway 6/24 and the Airport Electrical Vault. Work will include removing and replacing all electrical cables and wires. Phase 5 will be five (5) Working Days. Allowed Construction Time - 30 Working Days Liquidated Damages Cost - $2,250 Per Working Day Question Deadline 03/26/2026 Questions received less than seven (7) business days prior to the time and date for opening Bids will not be answered. contact office of Lochner, Reno, Nevada, (775) 346-3010 for interpretation.

GC Bidding

Transportation Terminals

$520,000.00

Public - County

Site Work

21

12

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
0
Bidding Soon
160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

May 6, 2026

Project location map

To Be Determined, Silver Springs, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.