BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Hancock, New Hampshire. Completed plans call for site work for a road / highway.

The Town of Hancock is requesting proposals for the delivery and placement of NH DOT shim mix and ½’’ hot asphalt pavement at various locations on town roads. Work includes applying a tack coat of emulsion to areas to be shimmed and rolling with a 3-5 ton roller as soon as the hot asphalt has reached optimum rolling temperature. Materials must conform to NH DOT surface treatment asphalt mix. Required equipment includes a mechanical paver with a track drive system, a 3-5 ton roller, and a tack truck or wagon. Locations and estimated tonnage are to be priced separately as follows: - Middle Road (Route 137- Vatcher Road): 7730’ x 21’ – 1525 Tons, Top coat 1.5’’ – ½’’ HMA with tac. - Cavender Road (Route 202 – Gravel interchange): 4660’ x 21’ – 920 Tons, Top coat 1.5’’ – ½’’ HMA with tac. - Kings Highway (Hunts Pond Road intersection to Landing Road intersection): Reclaim, grade, roll, water – 6150’ x 22’ – 15,033 sq yds. This road will be prepared for base paving in 2027. Contractor to install offsets and pink top centerline markers. All tonnages and locations are estimates; payment is based on actual tonnage in place. Proposals must remain in effect for 30 days from opening, and any price increases must be communicated within 48 hours. Work is scheduled for mid-May–June and must be completed before September 15, 2026. The Town provides traffic control (excluding delays due to contractor's trucks) and supervision of location and shim thickness. The contractor provides appropriate equipment, manpower, insurance certificates, and load slips for payment. Work hours are Monday-Thursday, 6AM–6PM. Questions regarding the proposal should be directed to Tyler Howe

Bid Results

Roads / Highways

$244,403.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2026

June 1, 2026

Project location map

Multiple Locations, Hancock, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.