BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; sidewalk / parking lot; and water / sewer project.

The work consists of City Funded Work and Federally and Provincially Funded Work. City Funded Work includes concrete pavement reconstruction and associated works on Charles Street from Sutherland Avenue to Jarvis Avenue; mill and fill and associated works on Jarvis Avenue from McPhillips Street to Parr Street; concrete pavement rehabilitation and associated works on Jarvis Avenue from Parr Street to Powers Street; construction of new 100mm concrete sidewalk and associated works on Sutherland Avenue from Robinson Street to Charles Street; pickup and installation of precast traffic calming curbs and polyposts at specified locations; and sewer repairs and associated works on Jarvis Avenue from McPhillips Street to Powers Street. Federally and Provincially Funded Work consists of concrete pavement reconstruction and associated works on Pembina Highway Alley from Pembina Highway to Dowker Street. The major components of the work include renewal and removal of existing sidewalks, pavement and curbs, planing of existing asphalt in intersections, excavation, compaction, installation and adjustment of manholes, catch basins, catch pits, sub-drains, sewer service pipe, insulation of water services, placement of geotextile fabric, sub-base and base course material, construction of various types of concrete pavement, curbs, pedestrian islands, raised concrete crosswalks, installation of detectable warning surface tiles, grading, placement of topsoil, MS1 asphalt overlay, and sod. Mill and Fill and Associated Works includes planing of existing asphalt, renewal and removal of concrete sidewalks, installation of warning tiles, concrete repairs, curb and sidewalk construction, grading, topsoil, and placement of asphalt overlays and sod. Concrete Pavement Rehabilitation and Associated Works consists of planing asphalt, renewal of sidewalks, excavation, base material compaction, construction of sidewalks and curbs, tree stump grinding, grading, paving stones re-grading, installation of pavement repair fabric, placement of asphalt overlays, and sod. Construction of new 100mm concrete sidewalk and associated works includes excavation, compaction, base course material placement, curb renewal, grading, and sod placement. Pickup and installation of precast traffic calming curbs and polyposts involves material pickup, pavement sweeping, installation of curbs and polyposts, sign base plates, dowels, and hole sealing. Sewer repairs consist of pre- and post-construction video inspection, point repair of sewer main, manhole and catch basin repairs, riser replacement, manhole removal and replacement, and installation of new manholes and connections to existing sewers. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Bid Results

Roads / Highways

$3,076,259.00

Public - City

Paving, Site Work

37

8

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
84
Bidding Soon
681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

June 2, 2026

Project location map

185 King Street, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.