BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a mixed-use development in Orange, California. Conceptual plans call for site work for a power facility.

The purpose of scope of work is to provide a feasibility study for installation of solar photovoltaic (PV) systems for OCTA bus bases. The PV systems are intended to provide renewable energy for bus base use, reduce carbon footprint, and offset electricity costs at the bus bases. OCTA is seeking proposals from architecture and engineering firms to provide professional and technical engineering services for the feasibility study (Project). The selected architecture and engineering firm (Consultant) shall have expertise and experience in study, design, installation, inspection, and commissioning of all aspects of work scope of PV systems. The Orange County Transportation Authority (Authority or OCTA) owns and operates the five maintenance and operations facilities (bus bases), one each in the Cities of Anaheim, Garden Grove, Santa Ana, and two in the City of Irvine. OCTA continues to evaluate on-site solar photovoltaic renewable energy generation options to support sustainable operations. Question Deadline 03/26/2026 at 5:00 PM PT All questions, including questions that could not be specifically answered at the pre-proposal conference must be put in writing and received via electronically *RFP Date Info: Proposals received after the specified date and time or submitted in any manner other than as specified will be returned to Offerors unopened. The Authority reserves the right to accept or reject any and all proposals, or any item or part thereof, or to waive any informalities or irregularities in proposals. The Authority reserves the right to withdraw or cancel this RFP at any time without prior notice and the Authority makes no representations that any contract will be awarded to any Offeror responding to this RFP. The Authority reserves the right to issue a new RFP for the project. The Authority reserves the right to postpone proposal openings for its own convenience. Each proposal will be received with the understanding that acceptance by the Authority of the proposal to provide the services described herein shall constitute a contract between the Offeror and Authority which shall bind the Offeror on its part to furnish and deliver at the prices given and in accordance with conditions of said accepted proposal and specifications. The Authority reserves the right to investigate the qualifications of any Offeror, and/or require additional evidence of qualifications to perform the work. Submitted proposals are not to be copyrighted. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Solar Power Generation

$300,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
663
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2026

April 15, 2027

Project location map

Multiple Locations, Orange, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.