BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2026 at 8:00 PM

Updated April 6, 2026

Renovation of a multi-residential development in Baltimore, Maryland. Completed plans call for the renovation of a two-unit multi-residential development.

Contractor shall provide all labor, material, equipment, supervision, permits and all things incidental to complete the scope of services as described in Attachment 1 Price Proposal and Detailed Scope of Work. Question Deadline 03/27/2026 at 2:00 PM ET Question will be received at online. Documents can be obtained at https://habc.bonfirehub.com/opportunities/ Locations-1505 Presser Ct, 1513 Presser Ct Renovation of 1505 Presser Ct Bid Sheet The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations. 1505 Presser Ct General: 1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in the Unit. 2. Replace closet shelving/closet rod as necessary 3. Final Cleaning of Entire Unit to Make Ready for Occupancy. Bathrooms: 1. Supply and install new Vanity Cabinet w/ Vanity Bowl and faucet 2. Remove existing toilet, Supply and install new toilet with a new toilet seat 3. Supply and install New Medicine Cabinet with Mirror 4. Supply and install all new bathroom Accessories, Non-UFAS 5. Supply and install new shower wall, tub faucet, tub spout and showerhead 6. Remove existing tub, Supply and install new tub. 7. Remove existing shower rod, supply and install new shower rod Kitchen: 1. Supply and install New Broan #4100 range hood (Black) 2. Supply and Install HUD severe use base and wall cabinets "Magnolia Cabinetry Harvard in 'Honey.' 3. Supply and install new countertops. 4. Install GFCI within 6ft of the kitchen sink if not applicable. 5. Supply and install new Delta kitchen faucet 6. Remove existing kitchen sink drain line, supply and install new stainless steel 1-1/2" (inch) drain line. 7. Remove existing, supply and install new laundry hookup box and hot /cold water valves. Bedroom # 1: 1. Remove existing vertical window blinds, supply and install new vertical window blinds (2) 2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass. 4. Paint existing Closet shelf and pole. Bedroom # 2: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Remove existing receptacle covers, supply and install new receptacle covers 3. Clean exterior and interior of heating convector of any debris. 4. Clean window frame including sills and wells (Lead Testing) and window glass 5. Paint existing closet shelf and pole. Livingroom: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Clean window frame including sills and wells (Lead Testing) and window glass 3. Remove existing receptacle covers, supply and install new receptacle covers 4. Clean exterior and interior of heating convector of any debris. 5. Clean window frame including sills and wells (Lead Testing) and window glass 6. Paint existing closet shelf and pole. Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) Electrical: 1. Remove existing cover plates, supply and install all Switches / Receptacles and metal cover plates. 2. Remove existing raceways, supply and install new raceways throughout entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Remove existing light fixtures, supply and install LED integrated light fixtures in common areas, kitchen, living room and bathroom. 4. Install 10 yr. sealed smoke detectors in every bedroom on ceiling 14" away from door. 5. Install combination smoke / carbon monoxide detectors on 1st and 2nd Floor common areas Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. o Paint existing handrails on 1st and 2nd level stairways o Exterior door and frame, porch front and steps and exterior railing shall be painted (Lead Testing) o The Contractor shall be responsible for all drywall replacement and or repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. o Paint shall be Sherwin Williams "Pro-Mar 200" in HABC Antique White color (or brand of equal color, finish, durability, etc.). Flooring: 1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit 2. All floors must be level before applying flooring... 3. Replace all treads and risers 4. Supply and install 4" Baseboard with Quarter Inch Round shoe molding and caulk as needed throughout unit. Renovation of 1513 Presser Ct Bid Sheet The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations. 1513 Presser Ct General: 1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in the Unit. 2. Replace closet shelving/closet rod as necessary 3. Final Cleaning of Entire Unit to Make Ready for Occupancy. Bathrooms: 1. Supply and install new Vanity Cabinet w/ Vanity Bowl and faucet 2. Remove existing toilet, Supply and install new toilet with a new toilet seat 3. Supply and install New Medicine Cabinet with Mirror 4. Supply and install all new bathroom Accessories, Non-UFAS 5. Supply and install new shower wall, tub faucet, tub spout and showerhead 6. Remove existing tub, Supply and install new tub. 7. Remove existing shower rod, supply and install new shower rod Kitchen: 1. Supply and install New Broan #4100 range hood (Black) 2. Supply and Install HUD severe use base and wall cabinets "Magnolia Cabinetry Harvard in 'Honey.' 3. Supply and install new countertops. 4. Install GFCI within 6ft of the kitchen sink if not applicable. 5. Supply and install new Delta kitchen faucet 6. Remove existing kitchen sink drain line, supply and install new stainless steel 1-1/2" (inch) drain line. 7. Remove existing, supply and install new laundry hookup box and hot /cold water valves. Bedroom # 1: 1. Remove existing vertical window blinds, supply and install new vertical window blinds (2) 2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass. 4. Paint existing Closet shelf and pole. Bedroom # 2: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Remove existing receptacle covers, supply and install new receptacle covers 3. Clean exterior and interior of heating convector of any debris. 4. Clean window frame including sills and wells (Lead Testing) and window glass 5. Paint existing closet shelf and pole. Livingroom: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Clean window frame including sills and wells (Lead Testing) and window glass 3. Remove existing receptacle covers, supply and install new receptacle covers 4. Clean exterior and interior of heating convector of any debris. 5. Clean window frame including sills and wells (Lead Testing) and window glass 6. Paint existing closet shelf and pole. Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) Electrical: 1. Remove existing cover plates, supply and install all Switches / Receptacles and metal cover plates. 2. Remove existing raceways, supply and install new raceways throughout entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Remove existing light fixtures, supply and install LED integrated light fixtures in common areas, kitchen, living room and bathroom. 4. Install 10 yr. sealed smoke detectors in every bedroom on ceiling 14" away from door. 5. Install combination smoke / carbon monoxide detectors on 1st and 2nd Floor common areas Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. o Paint existing handrails on 1st and 2nd level stairways o Exterior door and frame, porch front and steps and exterior railing shall be painted (Lead Testing) o The Contractor shall be responsible for all drywall replacement and or repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. o Paint shall be Sherwin Williams "Pro-Mar 200" in HABC Antique White color (or brand of equal color, finish, durability, etc.). Flooring: 1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit 2. All floors must be level before applying flooring... 3. Replace all treads and risers 4. Supply and install 4" Baseboard with Quarter Inch Round shoe molding and caulk as needed throughout unit

Bid Results

Multi-Residential

$31,700.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
7
Bidding Soon
2,316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.