Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 15, 2026 at 8:00 PM
Updated May 21, 2026
Remodeling of a municipal facility in Meyersdale, Pennsylvania. Working plans call for the remodel of a municipal facility.
**As of April 15, 2026, nobody bids on the project. No definite date for the rebid.** For the installation of an ADA Family Bathroom, a doorway at the meeting room, and an ADA Gym Door 1. Project Overview The purpose of this project is to construct a bathroom to ensure full compliance with the Americans with Disabilities Act (ADA) standards, installing ADA meeting room door and replacement of gym door. The renovation will improve accessibility, safety, and usability for individuals with disabilities, aligning with local building codes and ADA guidelines. 2. Objectives o Construct a bathroom that will be a unisex ADA-compliant facility. o Installing ADA meeting room door o Replacement ofinside gym door o Enhance accessibility for individuals with disabilities through barrier-free design. o Construct/ Install fixtures, finishes, and features to meet ADA requirements. o Ensure the work is completed within budget and the specified timeline. ADA Bathroom 3.1. Demolition and Preparation o Remove existing non-compliant fixtures, door, partitions, and flooring. o Prepare walls, floors, and plumbing systems for the new layout. o Dispose of all debris in accordance with local environmental regulations. 3.2. Structural Modifications o Construct doorway and install door to meet ADA standards. o ADA compliant door and handles. ADA automatic door opener and push buttons. o Adjust wall framing as necessary to accommodate grab bars, sinks, and other fixtures. o Construct wall framing and other design additions as stated in the designs. o Ensure floor leveling for a smooth, non-slip surface. o Install drywall on walls and ceiling. o Apply gray paint on walls. o Apply white paint to ceiling. 3.3. Plumbing o Locate and install fixtures (toilets, sinks) at ADA-compliant heights. o Install faucets with touchless operation. o Ensure proper insulation of pipes to prevent contact burns. 3.4. Electrical o Add appropriate lighting to ensure visibility. o Install light switches and outlets at ADA-compliant heights (between 15 and 48 inches above the floor). o Incorporate motion-sensor lighting or accessible switches as required. o Install Bathroom vent fan and light. o Install emergency lighting. 3.5. Fixtures and Features o Install ADA-compliant grab bars at specified heights and locations. o Install ADA Auto flush Toilet. o Install ADA Sink. o Install ADA auto sensing sink faucet. o Install ADA compliant toilet paper dispenser o Install ADA compliant hand dryer. o Install ADA compliant auto soap dispenser. o Install a mirror with a bottom edge no higher than 40 inches from the floor and top edge a minimum of 74 inches from the floor. o Install signage with Braille and high-contrast lettering. o Install child changing station. 3.6. Flooring and Finishes o Install slip-resistant flooring. o Minimum of 5mm Luxury vinyl water resistant floor planks, medium to dark gray. o Apply durable, low- volatile organic compounds (VOC) paint or wall covering. o Ensure smooth transitions between flooring types to avoid tripping hazards. o Install Standard wood trim. o Install Rubber base trim. ADA MEETING ROOM DOOR 3.7. Demolition and Preparation o Create drawing for installation. o Remove wall for doorway. o Prepare walls, floors, and doorway for the new door. o Dispose of all debris in accordance with local environmental regulations. 3.8. Structural Modifications o Construct doorway and install 36 inch out swinging door. o Install ADA door opener and push buttons o Install signage. o Install two exit signs with emergency lighting Gym Door 3.9. Demolition and Preparation o Remove existing door and wall as shown on drawings. o Prepare walls, floors, and doorway for the new door. o Dispose of all debris in accordance with local environmental regulations. 3.10. Structural Modifications o Construct doorway and install door as shown on drawings. o Install signage as shown on drawings. ADA Bathroom, ADA Meeting Room Door and Gym Door 3.11. Inspections and Compliance o Conduct interim and final inspections to ensure compliance with ADA standards and local building codes. o Obtain necessary permits and approvals. 4. Deliverables o Fully construct ADA-compliant bathroom and gym door. o Compliance documentation, including ADA checklist and permits. o Manufacturer warranties for fixtures and equipment installed. We are seeking a General Contractor to construct a bathroom, ensuring full compliance with the Americans with Disabilities Act (ADA) standards, install ADA meeting room door and replace interior gym door. The selected contractor will be responsible for: Managing the project from start to finish. 2. Constructing the ADA bathroom, installing ADA meeting room door and gym door replacement in accordance with the design by the Borough Engineer. 3. Contractor shall supply all materials. 4. Applying for the required permits. 5. Supplying all necessary materials, fixtures, and equipment. 6. Performing all labor to fully construct the ADA-compliant bathroom, ADA meeting room door and gym door replacement incorporating the client's specified design features.
Final Planning
Municipal
$100,000.00
Public - City
Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2026
October 15, 2026
215 Main St, Meyersdale, PA
Related To This Project
Meyersdale, PA
Bid Date: Apr 13 2026
Meyersdale, PA
Bid Date: May 19 2026
Meyersdale, PA
Bid Date: May 07 2026
Meyersdale, PA
Bid Date: Jun 09 2026
Meyersdale, PA
Bid Date: Apr 13 2026
Meyersdale, PA
Bid Date: Mar 23 2026
Meyersdale, PA
Bid Date: Feb 23 2026
Meyersdale, PA
Bid Date: Aug 11 2025
Meyersdale, PA
Bid Date: Jun 02 2025
Meyersdale, PA
Bid Date: May 01 2025
Meyersdale, PA
Bid Date: Jan 10 2025
Meyersdale, PA
Bid Date: Nov 05 2021
Meyersdale, PA
Bid Date: May 14 2024
Meyersdale, PA
Bid Date: May 02 2024
Meyersdale, PA
Bid Date: Jan 31 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
