Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 26, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Forest City, Pennsylvania. Completed plans call for site work for a road / highway.

Sealed proposals will be accepted for 20,216 square yards of a double bituminous seal coat using a polymer modified emulsion, CRS-2PM (E-3M) or RS-2PM (E-2M), and #8 stone with a 1.0% loss by wash, followed by a bituminous fog seal as per current PennDOT408 Specifications/Section 472. All material must be complete in place in conformance with current PennDOT Pub.408 Specifications. All materials and workmanship must meet the requirements and standards of PennDOT Publication 408, and bidders must be PennDOT pre-qualified for Work Class "F4" Bituminous Surface Treatments. Proposals must be on forms provided by the township. The Clinton Township Board of Supervisors reserves the right to accept or reject any and/or all proposals or portions thereof, and to delete projects and/or portions of the project depending on budgetary constraints and to waive any technicalities deemed to be in the best interest of the Township. All work must be completed by July 31, 2026; liquidated damages will apply at the rate of $875 per day for each day beyond this date that the work remains incomplete.

Post-Bid

Roads / Highways

$40,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
592
Active Projects
284
Bidding Soon
3,153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

May 8, 2026

Project location map

To be determined, Forest City, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed