BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a sidewalk / parking lot in Nazareth, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project Number: FDC-407-103924.1. Project Title: Rehab of Henry Woods Access Road. Location: Jacobsburg Environmental Education Center, Northampton County, Bushkill. Work includes: This project is being bid electronically via . Full details of DCNR's transition to electronic bidding is in the bid documents for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A. The work for this project will consist of repair, reclamation and repaving work of the sections of the existing paved roadway and other incidental construction of Bushkill Creek Access Road as specified in the plan, within Jacobsburg Environmental Education Center in Bushkill Township, Northampton County. B. The work included under this contract consists of the repair and repaving of sections of the existing paved roadway, including tie-ins with other existing roads, using fulldepth reclamation and paving; construction of a 2-foot-wide 2A shoulder on both sides of the roadway as indicated on the Contract Drawings. C. The work also includes maintenance and protection of traffic, erosion and sediment control measures and all miscellaneous incidental work. 1.2 Work Included A. The limits of work and requirements of the contract shall be as specified here in and as indicated on the contract drawings. B. The work shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of the Department. C. The Contractor shall be responsible to contact all utilities to have facilities within the work area located A. This Contract shall include all general construction work completed as depicted and defined on the attached contract drawings and as specified in these Contract Specifications. Without intending to limit and/or restrict the volume of work required by these Specifications, this Contract consists of the following items of work: 1. Full-Depth Reclamation (FDR) work consists of reclaiming the existing pavement to produce a minimum 6-inch compacted subbase, including an additional 2 inches of compacted No. 2A coarse aggregate, followed by the placement of 2.5 inches of 25-mm bituminous base course and 1.5 inches of 9.5-mm bituminous wearing course, all as shown on the Contract Drawings. 2. Construction of a 2-foot-wide 2A shoulder on both sides of the roadway along all full-depth reclamation and paving sections. 3. E&S Pollution control. 4. Maintenance and Protection of Traffic. B. These items are being undertaken to improve public safety and access and provide for the restoration of the deteriorated existing paved roadway sections within Jacobsburg Environmental Education Center.

Award

Sidewalks / Parking Lot

$81,088.00

Public - State/Provincial

Paving, Site Work

5

10

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,072
Active Projects
629
Bidding Soon
7,297
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

May 18, 2026

Project location map

400 Belfast Rd, Nazareth, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.