Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 16, 2026 at 8:00 PM
Updated May 21, 2026
Site work and paving for a road / highway in Joseph, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Region 3 OR82: Wade Point Rockfall Repair Project Wallowa Lake Highway Joshua Mccullough, RE OR82: Wade Point Rockfall Repair Project on the Wallowa Lake Highway (Rt. No. OR82) near Lostine. FAP ER00(042). ($ 500,000 - $ 1,000,000). Req. approx. 500 ft2 temp. signs; 2 ea PCMS; 40 hrs flag.; 132 ft temp. rmbl. strips; 1 ea port. traf. sig.; const. surv. wrk.; 650 ft asph. pvmt. sawcut.; 110 yd3 exc.; fin. rdbd.; 600 ft barr. mt. rk. prot. scr.; 5,300 ft2 pen. conc. seal.; 150 ton aggr. base; 51 ton CACP; 25 ft gd.rl.; 650 ft conc. barr. Completion Time: October 16, 2026. Classes of Work: either A) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances. This Project Contains Fuel Escalation Clause. Project Manager: Joshua Mccullough, Email: Odotconstructionlagrande@odot.oregon.govv The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 003 - Wade Point Rockfall Repair - OR82 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$431,290.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
June 8, 2026
Wallowa Lake Hwy, Joseph, OR
Related To This Project
Joseph, OR
Bid Date: Mar 18 2026
Joseph, OR
Bid Date: Mar 20 2026
Joseph, OR
Bid Date: Mar 03 2026
Joseph, OR
Bid Date: Dec 05 2025
Joseph, OR
Bid Date: Sep 11 2024
Joseph, OR
Bid Date: Jun 18 2024
Joseph, OR
Bid Date: Apr 02 2024
Joseph, OR
Bid Date: Feb 22 2024
Joseph, OR
Bid Date: Jun 16 2022
Joseph, OR
Bid Date: May 05 2022
Gold Beach, OR
Bid Date: Apr 09 2026
Portland, OR
--
Portland, OR
Bid Date: Apr 23 2026
Junction City, OR
Bid Date: Apr 14 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
