BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Gonzales, Louisiana. Completed plans call for site work for a water / sewer project.

FY2024-2025 Purchase and Install Isolation Valve in Public Drinking Water System, Parish of Ascension, Louisiana. Materials & labor for the installation of valves installed in some key locations to be able to isolate the drinking water system in small, controlled loops instead of needing to shut down large areas of the system to repair leaks or damages. o 4";4.35" - 5.28" O.D. - Hydra-Stop Insta-Valve- Valve on PVC, D.I., C.I. or AC pipe. Each valve takes approximately four hours to install once the pipe is excavated, cleaned and made ready for work o 6"; 6.48"-7.45 O.D.-Hydra- Stop Insta-Valve- Valve on PVC, D.I., C.I. or AC pipe. Each valve takes approximately four hours to install once the pipe is excavated, cleaned and made ready for work o 8"; 8.48" - 9.65" O.D.- Hydra- Stop Insta -Valve- Valve on PVC, D.I., C.I. or AC pipe. Price is for Insta-Valve with standard valve cartridge with pipe inside diameter of 7.80" or greater. If pipes have undersized inside diameter (DR 14 PVC and some AC pipe for example) an undersized valve cartridge will be required. Undersized valve cartridges are additional. o 10";10.55" -11.85" Hydra- Stop Insta-Valve - 10" 10.55- 11.85" O.D. OR 12"; 12.6- 14.55 O.D. - Hydra- Stop Insta-Valve on PVC, D.I., C.I. or AC pipe. For 10" - Price is for Insta-Valve with standard valve cartridge with pipe inside diameter of 9.75" of greater. If pipes have undersized inside diameter (DR 14 PVC and some AC pipe for example) an undersized valve cartridge will be required. Undersized valve cartridges are additional. Each valve takes approximately five hours to install once the pipe is excavated, cleaned and made ready for work. o Pricing Breakdown per valve: o Labor-$ o Equipment- $ o Material - $ It is recommended that insertion valves or line stops installed on AC or Thin wall PVC Pipe be partially encased in concrete to protect pipe and fitting. It is the contractor's responsibility to provide concrete and labor to install the concrete block. o Work is considered complete upon successful pressure test and insertion valve/line stop completion. The contractor is responsible for problems that may occur from backfill, pipe support, pipe failure etc. AC pipes are particularly at risk of pipe failure regardless of or precautions taken by contractors. o Design of valve/ line stop fitting support and thrust blocks are the responsibility of the contractor. Direct all questions regarding this project to: Dean Thomason Professional Project Manager Phone 225-454-9253

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
65
Bidding Soon
727
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

June 11, 2026

Project location map

To be determined, Gonzales, LA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.