BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a bridge / tunnel in Portland, Oregon. Completed plans call for site work for a bridge / tunnel.

A&E Design services are sought to repair the embankment and realign the Abbey Creek culvert at Kaiser Rd in NW Multnomah County. Question Submission Close Date 4/1/2026 4:00 PM PDT All questions must be submitted in Writing via the Q&A Board of Multco Marketplace. This project proposes to repair the embankment and realign Abbey Creek at the existing culvert at NW Kaiser Road (County Road No. 107) over Abbey Creek in west Multnomah County to protect the roadway and resist future flood events. Currently, Abbey Creek must make two 90-degree bends before entering the 8-foot- wide, 8-foot-tall, and 38-foot-long concrete box culvert with a concrete headwall. The orientation of the creek parallel to the road upstream of the culvert has led to significant erosion at the left bank of the creek and is threatening the integrity of the road prism. During the 2024 Winter Storm event, Abbey Creek at NW Kaiser Road flooded. The culvert containing Abbey Creek partially failed and the creek eroded the embankment. The road has since been temporarily repaired by adding riprap to the base of the embankment. Wallis Engineering, and subconsultant Wolf Water Resources, completed 30% design plans and cost estimate. This project is to complete DAP to PS&E.

Bid Results

Bridges / Tunnels

$570,000.00

Public - County

Site Work

7

7

4

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

June 30, 2026

Project location map

NW Kaiser Rd, Portland, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.