BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 5, 2026 at 8:00 PM

Updated June 10, 2026

Site work and new construction of a power facility in Amesville, Ohio. Working plans call for the construction of a power facility; and for site work for a power facility.

As of June 5, 2026 no bids received no definite date for the rebid. The potential sites for array installations include: Amesville Sites Site A1: ~10.5 kW installed across from Amesville Elementary School (23 Main St.). Site A2: ~12 kW installed behind the Amesville Fire Department (16 Maple St.). Coolville Site Site C1: ~50+ kW installed on Rock Road behind Coolville Elementary School (26461 Main St.). The Project consists of all labor, materials, and services necessary to install solar photovoltaic systems at 2 sites within the Village of Amesville and 1 site within the Village of Coolville. In Amesville Site A1 is across from the Amesville Elementary School (23 Main St. Amesvile, OH 45711). Site A2 is behind the Amesville Fire Department (18 Maple St., Amesville, OH 45711). The location for solar photovoltaic panels in Coolville is on Rock Road behind the Coolville Elementary School (26405 Main St. Coolville, OH 45723). Proposals must limit their cost to below $320,000 while providing all labor, materials, and services to install solar photovoltaic systems at multiple sites in the Village of Amesville and the Village of Coolville. The project goals include: 1) Generate clean and renewable energy to offset operational costs. 2) Demonstrate commitment to sustainability and environmental responsibility. 3) Facilitate resiliency through potential back-up capability when the grid is down. 4) Provide an opportunity to shadow the installation process by recent participants in the grant-funded solar installer certification course hosted by the Village of Amesville. Any questions and answers will be provided by email to all individuals who request the RFP package. There will be no pre-proposal meeting for this project. For any additional information, and to request an electronic Request for Proposal or other project specifics, please contact the Project Manager Michael Yandrich, PE at mjy@nrenginc.com or call 740-566-5699.

Final Planning

Solar Power Generation

$320,000.00

Public - City

New Construction, Site Work

148

7

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
113
Bidding Soon
2,442
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

December 4, 2026

Project location map

Multiple Locations, Amesville, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.