BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Riverside, California. Completed plans call for site work for a water / sewer project.

In general, this project consists of the installation of Full Trash Capture Devices (FTCD) known as Connector Pipe Screens (CPS) in existing storm drain inlet structures located throughout the Santa Margarita, Santa Ana, and Whitewater watersheds within the County of Riverside jurisdiction, in order to comply with the California State mandated trash provisions. A FTCD - CPS consist of a metal screen assembly installed inside a catch basin in front of the entrance to a connector pipe that prevents debris from entering the storm drain system. The principal goal is to reduce the amount of trash, particularly plastics, that ends up in the state's rivers, creeks, and ocean. The drainage inlet facilities are located in identified significant trash generating areas in the Santa Ana, Whitewater and Santa Margarita watershed regions of the County of Riverside. The exact locations of the storm drain inlets (in the form of latitude and longitude coordinates) are shown on the project plans. The number of trash capture devices to be installed are: 138 in the Santa Ana watershed, 77 in the Whitewater watershed, and 34 in the Santa Margarita watershed, for a total of 249 trash capture devices. The work done under these specifications includes but is not limited to: Furnishing and installing necessary temporary traffic control devices at construction locations Cleaning storm drain inlets/boxes and connector pipe including removal and proper disposal of all material cleaned Verifying all storm drain structures dimensions to determine the FTCD - CPS measurements Installation of FTCD - CPS Any other work as may be required Type of Award Lump Sum License Requirements California Class "A" Contractor's license Bid Valid 90 Days Liquidated Damages $3,000 per day Estimated Bid Value $1,450,000 - $1,700,000 Start/Delivery Date Award Construction contract within 90 days of bid opening, start work about 1 month after award. Project Duration 80 Working Days County of Riverside Transportation Plan Holder List registration and notifications: Bidding Contractors who obtain digital copies of Plans and Bid Book from planroom(s) are advised to contact (951) 955-6780 (or Bids-Contracts@rivco.org) to have company contact information entered on our Plan Holder List so that we can directly contact your company with any bidding notifications regarding this project. Request for e-mail notifications: Email Bids-Contracts@rivco.org with "Request for e-mail notifications regarding bids" in the subject line to be added on an e-mailing notification list regarding this webpage. E-mail notices are sent to this notification list when new County public works project bids are added, amended, and/or when bid summaries are posted. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$480,950.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

June 12, 2026

Project location map

Multiple Locations, Riverside, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.