BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a mixed-use development in Roseville, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Sealed Proposals for Firethorne Area Street Rehabilitation The Work shall consist of, but not be limited to, removal and construction of concrete hardscapes such as: access ramps, driveway approaches, sidewalk, and curb/gutter; removal and construction of new asphalt concrete pavement, adjustment of valve boxes, water pollution control, and all related work. The time of completion of contract shall be fifty (50) working days as defined in the Standard Specifications for Public Works, 2024 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $2,400 per calendar day. Award of Contract: April 21, 2026 Deadline to submit contract documents: May 12, 2026 Pre-Construction Meeting: May 15, 2026 Notice to Proceed/Start Construction: May 26, 2026 Results will be available online. For this contract, the contractor shall possess Class A license at the time the bid is submitted. Contractor shall take note of the following dates and milestones. Contractor will take full responsibility for completing all precursory requirements necessary for this issuance. Each bid must be accompanied by a bidder's bond, or certified check, or cashier's check, made payable to the City of Fullerton, for an amount equal to at least 10% of the bid amount, such guarantee to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. A digital copy of the security shall be uploaded as part of the bid submittal with the three apparent lowest bidders required to submit original hard copies to the City within three (3) working days of bidding opening. In addition, a Performance Bond in the amount of 100% of the bid, and a Labor and Materials Bond in the amount of 100% of the bid shall be required of the successful bidder prior to entering into a contract. The City will permit substitution of approved securities for monies retained on this project in accordance with Section 7-3.2 of the Standard Specifications for Public Works Construction ("Greenbook"), 2024. The City Council reserves the right to reject any and all bids, to waive any informality or irregularity in the bidding, and to accept any bid when it is to the advantage and best interest of the City to do so, by order of the City Council of the City of Fullerton. Question Deadline 03/31/2026 at 1:00 PM PT Any questions regarding this bid package shall be submitted through electronically. Questions asked of the Project Engineer after this time will not be addressed.

Award

Roads / Highways

$1,712,240.00

Public - City

Paving, Site Work

13

4

4

5

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
383
Active Projects
156
Bidding Soon
1,925
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

May 26, 2026

Project location map

Multiple Locations, Roseville, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.