BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Mansfield, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.

The work of this Contract includes furnishing all labor, materials, equipment, and incidentals necessary to perform CCTV inspection and cleaning of 8-in sewers as well as rehabilitation of sewers through cured-inplace pipe (CIPP) lining, service lateral connection lining, service lateral lining, and manhole rehabilitation. Scope of work includes, but is not limited to the following: preparatory cleaning of sewers, service laterals, and manholes where required, including, CCTV inspection; heavy cleaning where required; dye testing of two properties to confirm if three service connection are active; CIPP lining of 8-in gravity sewer; reinstating and the lining of service lateral connections in 4-in, 5-in, and 6-in services extending a minimum of 24-in into the lateral; installing service lateral liners extending to the back of the sidewalk of the active service; grouting of service lateral connections that cannot be lined; management of all mainline and service flow; manhole rehabilitation including cementitious interior manhole lining; cleaning prior to lining; chemical root control; locating buried manholes and raising to grade and installing new frame and cover; and miscellaneous site work and restoration including all work and cleanup necessary to complete the work as detailed in the Contract Documents. All of the work is being performed in the areas shown on the Plans (found in Appendix A and B and specified in the attached Tables A, B and C in Section 01010. Question Deadline 04/16/2026 All questions about the meaning or intent of the Contract Documents shall be received in writing by CDM Smith Inc., 75 State Street, Suite 701, Boston, MA 02109 Attn: Mr. Ryan Connor or at connorrj@cdmsmith.com The Successful Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the Owner. Complete instructions for filing Bids are included in the Instructions to Bidders. The Contract Time for the Base Bid shall be a total of 45 calendar days, excluding final paving (if necessary), commencing 20 days following the effective date of the Agreement. additional Contract Time for Additive Alternate 1 will be 30 calendar days. Final paving (if necessary) shall be completed in 14 consecutive calendar days and no later than December 31, 2026.

Bid Results

Water / Sewer

$219,965.00

Public - City

Paving, Site Work

4

42

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
791
Active Projects
433
Bidding Soon
4,951
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

May 25, 2026

Project location map

Multiple Locations, Mansfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.