Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 7, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a civil project in Raccoon, Pennsylvania. Completed plans call for site work for a water / sewer project.
The scope of work included under - Elevated Water Storage Tank and Valve Vault includes installation of a level control valve vault at the existing Raccoon Elevated Water Storage Tank. The project also includes approximately 100 linear feet of relocation and abandonment of existing waterline connecting the distribution system to the elevated water storage tank; as well as installation of SCADA provisions for monitoring the Raccoon Elevated Water Storage Tank, Raccoon Booster Station and First Alley Booster Station at the existing Water Filtration Plant. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General Construction in accordance with the Contract Documents. Pennsylvania prevailing wage rates apply. Proposals must be upon the forms furnished by the Municipal Water Authority of Aliquippa. The bid must be accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid, made payable to the Municipal Water Authority of Aliquippa to guarantee the bidder's entrance into the contract if given the award. No bid bond shall be waived or returned because the Bidder has failed to or cannot comply with any requirements as set forth in the plans, specifications, or any applicable statutes of the State of Pennsylvania or any applicable municipal ordinances. Any technical questions regarding the bid documents are to be directed to LSSE. The Municipal Water Authority of Aliquippa shall (a) award the construction contract to the lowest responsible bidder therefore, or (b) reject all bids received within ninety (90) days of the date of bid opening; provided, however, that the Municipal Water Authority of Aliquippa may, in its sole discretion, delay such award or rejection for up to one hundred twenty (120) days from the bid opening date until the Municipal Water Authority of Aliquippa has received all required approvals from other governmental agencies.
Award
Water / Sewer
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2026
May 13, 2026
Multiple Locations, Raccoon, PA
Related To This Project
Raccoon, PA
Bid Date: Apr 11 2023
New Stanton, PA
Bid Date: Jun 03 2026
West Mifflin, PA
--
Midland, PA
Bid Date: Jul 07 2026
Langhorne, PA
--
Pittsburgh, PA
Bid Date: Apr 06 2026
Harrisburg, PA
Bid Date: Apr 08 2026
Genesee, PA
Bid Date: Apr 14 2026
Ohio Township, PA
Bid Date: Apr 07 2026
Hanover, PA
Bid Date: Apr 14 2026
Pittsburgh, PA
Bid Date: Apr 23 2026
Edwardsville, PA
Bid Date: Apr 23 2026
Norristown, PA
--
Monongahela, PA
Bid Date: Apr 27 2026
Portland, PA
Bid Date: Apr 23 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
