BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a municipal facility in Redding, California. Completed plans call for the renovation of a municipal facility.

Question Deadline 04/14/2026 at 2:00 PM PT . Questions regarding this IFPQ must be submitted in writing . Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 02A2475. Questions must be sent to the following email: Email: Kae.Saechin@dot.ca.gov an estimated value of greater than $5,000.00, but not more than $461,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contractor shall provide all labor, equipment, tools, parts, materials, supplies, travel, permits, fees, and incidentals necessary to perform removal, legal disposal, and replacement services of doors and door frames. A. Contractor shall remove and legally dispose of the 14 previous doors and door frame on the Special Crews Building and Maintenance/Landscape Building at the Caltrans Redding MS. B. Contractor shall field verify the door sizes and fire ratings of existing doors before the start of work. C. Contractor shall confirm the color of the doors prior to ordering or painting. (one color will be chosen for entire group of doors being replaced) Caltrans Contract Manager approval shall be required prior to ordering. D. After receiving a Notice to Proceed from Caltrans Contract Manager in writing, Contractor shall perform the following tasks: 1) Contractor shall identify the doors to be measured and confirm door type prior to ordering. 2) Contractor shall schedule each door removal and reinstallation. 3) Contractor shall verify doors are of equal standard or better than current doors. (Like and kind with equal fire rating where applicable.) 4) Contractor will need to coordinate with Caltrans' contract manager for access to facility to ensure security and safety of all employees. E. Contractor shall complete and invoice all work within four (4) months of the Notice to Proceed unless approved in writing by Caltrans Contract Manager. F. Contractor shall use materials free from defects which would adversely affect the performance or maintainability of individual components or of the overall assembly. G. Materials not specified shall be of equivalent or better quality used for the intended purpose per industry standards. H. Unless otherwise stated, all equipment, material, and articles incorporated in the work covered by this Agreement are to be new. I. Contractor shall perform all work according to manufacturer, industry standards, Federal, State, and local building codes. J. Contractor shall verify all measurements prior to ordering any material. All work and materials provided shall comply with all current Federal, State and Local laws and regulations. K. Contractor shall only use qualified trained personnel on job site, and no day labor shall be used.

Post-Bid

Municipal

$461,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
17
Bidding Soon
207
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

June 30, 2026

Project location map

1450 George Dr, Redding, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.