Published April 11, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of an educational facility in Snow Camp, North Carolina. Completed plans call for the renovation of a educational facility.
Reference Number 0000418182 Source ID PU.SC.USA.2305999.C13510551 Piggyback Contract No Question Deadline 04/10/2026 at 4:00 PM ET Questions are submitted online No Submit questions to REI Engineers, Inc. in writing to the Project Manager's email address jdavinson@reiengineers.com Sylvan Elementary School Roof Replacement. Note: Contractor's main office must be within two (2) hours of Burlington, NC. All bidders are hereby notified that they shall be properly licensed under the state laws governing their trades. Bid security in the amount equal to not less than 5% of the gross amount of the bid is required. A Performance Bond and Payment Bond in the amount of the contract is required. Participation Requirements - Minority Business Participation General Requirements - Employee Background Checks Required - Installation Required - Insurance Required - License Required This work includes the provision of labor, material, equipment, supervision and administration to integrate the work outlined in these specifications into the total building system such that no leakage into the system occurs. In general, the scope of work in the Base Bid includes: 1. Roof Replacement - Roof Sector A: a. Remove and dispose of the roof system including flashings and sheet metal down to the wood deck. b. Secure the deck to structural framing members. c. Provide 1.5" Roof Insulation loose laid d. Provide 1.5" Roof Insulation mechanically attached e. Provide Cover Board adhered in foam adhesive. f. Fully adhere thermoplastic single ply membrane along with flashings and accessories. g. Replace sheet metal flashings and trim. h. Provide a complete, watertight, 20-year warrantable roof assembly. 2. Low Slope Roof Replacement - Roof Sectors A1, B1, D: a. Remove and dispose of the roof system including flashings and sheet metal down to the wood deck. b. Secure the deck to structural framing members. c. Provide 1.5" Roof Insulation mechanically attached d. Provide Tapered Insulation adhered in foam adhesive. e. Provide Cover Board adhered in foam adhesive. f. Fully adhere thermoplastic single ply membrane along with flashings and accessories. g. Replace sheet metal flashings and trim. h. Provide a complete, watertight, 20-year warrantable roof assembly. 3. Low Slope Roof Replacement - Roof Sector B, B3: a. Remove and dispose of the roof system including flashings and sheet metal down to the poured gypsum deck. b. Provide base sheet. c. Provide 1.5" Roof Insulation adhered in foam adhesive. d. Provide Tapered Insulation System adhered in foam adhesive e. Provide Cover Board adhered in foam adhesive. f. Fully adhere thermoplastic single ply membrane along with flashings and accessories. g. Replace sheet metal flashings and trim. h. Provide a complete, watertight, 20-year warrantable roof assembly. 4. Low Slope Roof Replacement - Roof Sector H1: a. Remove and dispose of the roof system including flashings and sheet metal down to the steel deck. b. Provide Gypsum Substrate loose laid where removed. c. Provide 1.5" Roof Insulation loose laid. d. Provide 1.5" Roof Insulation mechanically attached. e. Provide Cover Board adhered in foam adhesive. f. Fully adhere thermoplastic single ply membrane along with flashings and accessories. g. Replace sheet metal flashings and trim. h. Provide a complete, watertight, 20-year warrantable roof assembly. 5. Low Slope Roof Replacement - Roof Sectors C, B2 , H2 a. Remove and dispose of the roof system including flashings and sheet metal down to the steel deck. b. Provide Gypsum Substrate loose laid where removed. c. Secure the deck to structural framing members. d. Provide 1.5" Roof Insulation mechanically attached e. Provide Tapered Insulation System mechanically attached. f. Provide Cover Board adhered in foam adhesive. g. Fully adhere thermoplastic single ply membrane along with flashings and accessories. h. Replace sheet metal flashings and trim. i. Provide a complete, watertight, 20-year warrantable roof assembly. 6. Low Slope Roof Replacement - Roof Sectors I and J: a. Remove and dispose of the roof system including flashings and sheet metal down to the insulation to remain. b. Replace wet or damaged insulation. c. Provide 1.5" Roof Insulation mechanically attached.. d. Provide Crickets and Saddles. e. Provide Cover Board adhered in foam adhesive. f. Fully adhere thermoplastic single ply membrane along with flashings and accessories. g. Replace sheet metal flashings and trim. h. Provide a complete, watertight, 20-year warrantable roof assembly. 7. Standing Seam Metal Roof - Roof Sector H: a. Remove and dispose of the roof system including flashings and sheet metal down to the plywood deck. b. Secure the deck to structural framing members. c. Provide underlayment. d. Provide standing seam metal roof panel system along with flashings, trim and accessories. e. Provide a complete, weathertight, 20-year warrantable roof assembly with 30-year finish warranty.
Post-Bid
Educational
$200,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2026
May 21, 2026
7718 Sylvan Rd, Snow Camp, NC
Related To This Project
Snow Camp, NC
Bid Date: Nov 07 2024
Snow Camp, NC
Bid Date: Mar 04 2022
Wadesboro, NC
--
Concord, NC
--
Sanford, NC
--
Raleigh, NC
Bid Date: Apr 29 2026
Matthews, NC
--
Matthews, NC
--
Wake Forest, NC
--
Winston Salem, NC
Bid Date: Apr 21 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.