BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2024 at 7:00 PM

Updated November 20, 2024

Site work and paving for a mixed-use development in Snow Camp, North Carolina. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project consists of constructing a 39-space gravel parking lot and work shall consist of clearing, tree removal and disposal, grading; installation of driveway pipe, 8-inches ABC stone base, 6 concrete pavement, curb stops, wattles, silt fence and special sediment fence and other erosion control devices, handicap signs and pavement markings, seeding and mulching and installation of traffic control signs and devices during construction. Should you have questions regarding the bid documents, please feel free to contact me. It is anticipated that the contract will be awarded in December 2024 and may begin construction Late December 2024 and contract completion date is scheduled for June 15, 2025. Question Deadline 10/28/2024 Questions received less than 10 days prior to the date for opening of Bids may not be answered. All questions about the meaning or intent of the Bidding Documents and the Contract Documents shall be submitted to Engineer in writing

Bid Results

Sidewalks / Parking Lot

$48,966.00

Public - County

Paving, Site Work

9

5

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
150
Bidding Soon
1,880
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

December 9, 2024

Project location map

5075 Bass Mountain Rd, Snow Camp, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.