BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2026 at 8:00 PM

Updated May 21, 2026

This is a service / maintenance or supply contract in Malibu, California. Contact the soliciting agency for additional information.

The City of Malibu, California is requesting proposals from qualified firms to provide Professional Engineering Services for the design of the Pacific Coast Highway (PCH) Wastewater Project including Surveying, Geotechnical, Public Engagement, Subsurface Investigations, and Video Inspections for the new wastewater collection system connecting to the Los Angeles Sanitation & Environment (LASAN) Hyperion Water Reclamation Plant (Hyperion). These services shall encompass and include all work, services, materials and equipment necessary to prepare and deliver Engineering services as described within this proposal. All engineering work shall be in compliance with the City's Local Coastal Plan (LCP) and Municipal Code, California Vehicle Code, Building Safety Codes, and other applicable regulations and standards. All engineering services shall be conducted under the direction of a Registered Civil Engineer licensed in the State of California. Project Background and Description In January 2025, the City of Malibu (City) and surrounding areas were significantly impacted by the Palisades Fire which began in Santa Monica Mountains. The fires caused severe damage and destruction to residential and commercial properties, particularly areas near Sunset Mesa and in eastern Malibu. On January 12, 2025, Governor Gavin Newsom signed an Executive Order N-1-26 to help communities rebuild faster and more affordably. The Executive Order suspended permitting and review requirements under the California Environmental Quality Act (CEQA) and the California Coastal Act for the Palisades rebuilds. As the recovery efforts commenced, the City contracted Woodard & Curran to evaluate the feasibility of construction of the new wastewater collection system on PCH connecting to Hyperion. The system would serve the waterfront properties along PCH within the areas of the City affected by the Palisades Fire. The new sewer collection system would replace the existing onsite wastewater disposal systems (OWDS) for these properties, which consist primarily of septic tanks and leach fields, and require seawalls for protection. Woodard & Curran completed the City of Malibu Wastewater Collection System on PCH to LASAN Connection Preliminary Design Report on February 9, 2026. The Report, which is provided as Attachment C, evaluated the required sewer collection system facilities on PCH to serve the affected properties and provides an overview of the Project implementation cost and schedule and included the following: Estimated the sewershed flows based on the parcels to be connected to the new sewer collection system within the Project area. Determined the size and preliminary locations of gravity sewers, lift stations, and force mains required to connect the parcels and convey sewage to the LASAN wastewater collection system. Identified significant crossings for the sewer system along PCH and evaluated constructability. Provided a preliminary capital cost estimate for the Project. Provided a preliminary Project implementation schedule. Question Deadline 04/23/2026 at 4:00 PM PT All questions regarding the Request for Qualifications/Proposals (RFQ/P) must be submitted in writing. Please send all questions regarding this Request for Qualifications/Proposal in writing via email to Tatiana Holden, Interim Public Works Director, at tholden@malibucity.org The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
486
Active Projects
253
Bidding Soon
3,363
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2026

Project location map

To Be Determined, Malibu, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.