BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a playground / park / athletic field in El Cajon, California. Completed plans call for site work for a playground / park / athletic field.

Playground Installation, Bostonia Elementary. Installation of new TK Playground within existing playground area. The project will consist of furnishing and installation of fencing, demo of existing asphalt, excavation,installation of concrete curbs, installation of new playground structure and associated wood chip fall zone surface system as shown in the contract documents. Playground equipment is owner purchased and contractor installed. It will be the responsibility of the contractor to coordinate the delivery, offloading, inventory, acceptance, and storage of play equipment at installer's facility until time of installation. Cost Estimate: $110,000.00. DVBE (3%) Beginning Date of Contract: June 20, 2026 Ending Date of Contract: August 8, 2026* Request Deadline: 4/6/26, 12:00 PM. Questions are to be submitted by e-mail to hokensonp@cajonvalley.net, referencing Bid #1697 in the subject. Pre-Bid Meeting: Job Walk at Bostonia Global Elementary School, 1390 Broadway, El Cajon, CA 92021. Work will be completed while school is not in session during Summer Break. Contractor shall provide and install 6' temporary chain link fence panels around the area of work to protect the public and staff. Scope of Work: 1. Sawcut, remove and haul away existing asphalt and concrete materials as required to create new wood chip fall zone per the attached documents and associated code requirements. 2. Excavate soil and remove from site to a depth and area required to install new flush fall zone area. 3. Install new District purchased playground equipment in accordance with manufacturer recommendations and associated regulatory agency requirements. Refer to attached Playworld Equipment Details, Attachment A. 4. Provide and install new wood chip fall zone area as shown in the contract documents, meeting the requirements of the manufacturer recommendations and associated regulatory agency. Excavate area to minimum depth of 16". Provide & install 4" depth 3/4 " drainage rock, drain felt and minimum depth of 12" cushioning chips. 5. Install new compliant ramp as needed to meet all ADA requirements 6. Install new 18" deep x 6" wide concrete curb on all sides as needed to create the 31' x 31' area required as shown in documents to allow for flush transition from. Concrete to be a minimum of 2500 psi and curb to have continuous #4 rebar top and bottom. Over lapping bar splices to be a minimum of 16". 7. Install new 4' chain link fencing and gates to secure area as shown in the contract documents. Fencing to be typical 9-gauge galvanized fabric and schedule 40 posts. Gates and hardware to match existing chain link systems onsite. 8. At the area shown in the site map, adjacent to new fencing, remove existing grass lawn, cap and isolate irrigation, and remove soil to allow for new 3'' over native installation of asphalt. Asphalt to flush out with all adjacent areas.

Award

Playgrounds / Parks / Athletic Fields

$88,355.00

Public - City

Site Work

3

9

4

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
110
Bidding Soon
1,208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2026

June 20, 2026

Project location map

1390 Broadway, El Cajon, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.