Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 10, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.
Perez ES_ Mold Remediation in First Floor Rooms. Bids must be submitted electronically via Bonfire. Walk-thru location: Perez ES, 1241 W. 19th Street, Chicago, IL 60608. For a copy of bid documents, contact Debbie Chiu at 312-783-7867. Public bid reading is available via Google Meet. Pre-qualification requirements: ONLY PREQUALIFIED POOL Environmental Contractors are eligible. Contractor/Vendor shall provide a Proposal for the necessary Labor and Materials to perform environmental mitigation activities . Removal and disposal shall be conducted in accordance with CPS Specifications 01 57 19 and 02 85 00 and all applicable IDPH, IEPA, and OSHA regulations. Indoor Air Quality (IAQ) Management Plan- Controls include the containment or removal of all nuisance or noxious dust, vapors, fumes, odors or emissions caused by construction, demolition, renovation, restoration, or related activities including, but not limited to sawing, cutting, grinding, sanding, abrading, sweeping, crushing, scraping, gluing, prying, plowing, heating, finishing, painting, welding, torch cutting or burning, or any other related processes that can create noxious dust, fumes or odors. MOLD REMEDIATION - A. Refer to Contract Drawings and Environmental Scope Sheets in Section 02 24 01. B. The work includes all labor, equipment, materials and supplies necessary to perform the Scope of Work in the Documents by the procedures described herein. By submitting a bid for the work, the contractor represents itself as knowledgeable and expert in the performance of the work, and includes all things usually and customarily necessary to provide a complete and finished job, whether specifically mentioned or not. C. This work includes the removal of mold-impacted materials listed in the Documents, including pre-cleaning, moving furnishings, establishing regulated areas, isolating the work areas, protecting adjacent areas, containment when required, cleanup and decontamination to the specified clearance levels, proper packaging and disposal of wastes and all other steps necessary to complete the scope of work. D. Repair or replacement of damaged surfaces, fixtures or furnishings to restore them to their preexisting condition to the satisfaction of the AOR and Board Representative. E. When the documents include lead, asbestos and mold-impacted items in the same spaces, they should be performed in the sequence and combinations that produce the most efficient results, minimize concentrated lead waste volume and produce the least amount of total waste. That sequence will generally be: 1. Cleanup of lead dust, flakes, chips and residues most likely to fail a TCLP test. If both lead and mold-impacted debris are present and mixed together, they may be cleaned up and disposed of together. 2. Cleanup and removal of failed or delaminated friable asbestos-containing debris, if any. 3. Removal of friable asbestos materials and cleanup of visible residues. 4. Removal of lead-bearing architectural components. 5. Removal of non-friable asbestos items. If both asbestos and lead are on the same components, for example lead paint and asbestos-containing glazing compound, the components may be removed and disposed of with both the lead and asbestos-bearing items intact. 6. Removal of lead-based paint, coatings, or surfacing material. 7. Removal of any remaining mold-impacted material(s). 8. Final cleanup and decontamination of the workspace. Final air clearance (for molds or asbestos) and wipe samples (for lead or molds) may be performed concurrently. 9. When lead, asbestos and mold contamination final decontamination processes are combined, the more stringent cleanup procedures will apply.
Bid Results
Educational
$22,250.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
