BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 3, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Bettendorf, Iowa. Completed plans call for site work for a sidewalk / parking lot; and road / highway.

The proposed improvements consist of rotomilling the existing asphalt surface, pavement removal, installing granular subbase, resurfacing various streets with Hot Mix Asphalt (HMA), constructing storm sewer, curb and gutter, driveways and sidewalks, and other related work as shown in the construction drawings, all within the City of Bettendorf, Iowa. Before the start of construction, the Contractor shall submit a line of march and schedule of work listing critical path items, including curbing, headers, milling, patching, casting adjustment, surface course, base course, and other required items to establish a time schedule for the program. No work shall start prior to holding a Preconstruction Meeting, at which time a start date will be approved by the Engineer or representative. The construction of sidewalks and boxouts shall begin within seven calendar days after street resurfacing and be completed in a timely manner. All work shall be in strict compliance with the plans and specifications prepared by the Engineer of the Engineering Division of the Public Works Department of Bettendorf, Iowa. All bids must be submitted electronically through the City's electronic bid submission system. No paper, emailed, or faxed bids will be accepted. A certified or cashier's check or a Bid Bond in the amount of ten percent of the bid must accompany each proposal. The successful bidder will be required to provide a performance and maintenance bond equal to one hundred percent of the contract price, guaranteeing faithful performance and maintenance of the improvement for four years after completion and acceptance. Preference will be given to products and labor from Iowa, and a preference will be given to resident bidders. The City reserves the right to reject any or all proposals and to waive technicalities and irregularities if deemed necessary and approved by City Council. INTERPRETATION OF PROPOSED CONTRACT DOCUMENTS - If any person contemplating submitting a Bid for the proposed contract is in doubt as to the true meaning of any part of the plans, specifications, or other proposed contract documents, they may submit to the City a request for an interpretation thereof through the bid submission system. Any interpretation of the proposed documents will be made only by addendum duly issued to each person receiving a set of such documents. The City will not be responsible for any other explanations or interpretations of the proposed documents and will not accept requests within 48 hours of the bid opening.

Award

Roads / Highways

$556,822.00

Public - City

Paving, Site Work

29

11

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
120
Bidding Soon
1,717
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

April 27, 2026

Project location map

Multiple Locations, Bettendorf, IA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.