BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Rivergrove, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of May 6, 2026, this project has been awarded.** The scope of work consists of pavement rehabilitation on various streets within Lake Oswego as well as major upgrades to the existing signalization at five intersections: Kruse Way and Carman Drive, Kruse Way and Westlake Drive, Kruse Way and Kruse Oaks Drive, Bangy Road and Meadows Road, and Bangy Road and Bonita Road. These improvements will bring these signalized intersections into current industry standards for detection. The project will also construct about 60 curb ramps to bring them into compliance with current Americans with Disabilities Act (ADA) requirements. Most of these are located at the intersections within the paving limits. Work will consist of: temporary signage for pedestrian and traffic control, replacement of several stormwater catch basins, removal of asphalt concrete (grinding), construction of asphaltic concrete pavement inlays and overlays, installation of pavement markings, installation and replacement of some water lines, and performance of additional and incidental work as called for by the specifications and plans. Bids shall be submitted electronically only and must be received before the Bid Closing Time. Bidders must complete all required fields and upload bid forms via the provided online submission link. Bidder will receive an automated email confirmation and may verify receipt by phone. Bids will not be accepted after the Bid Closing Time. Bidders are encouraged to submit bids early. Bidders must submit a Bid Security in the amount of 10% along with their Bid. Because the contract value is estimated at $100,000 or greater, bidders must submit a First Tier Subcontractor Disclosure Form (provided in the Bid Documents) no later than 4:00 p.m. on the bid receipt date, via the same online link as the Bid. Questions about the Bid Documents should be submitted through the project bid site no later than seven days prior to Bid Closing Time. Clarifications will be made by addenda only; oral statements are not binding or legally effective.

Award

Roads / Highways

$5,000,000.00

Public - City

Paving, Site Work

85

16

7

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
84
Bidding Soon
1,334
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

June 22, 2026

Project location map

Multiple Locations, Rivergrove, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.