Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 20, 2026
Site work for an industrial development in Kapolei, Hawaii. Completed plans call for site work for a industrial development.
The Estimated Budget for This Project is $3,200,000.00. The project is for the NPDES MS4 Structural Best Practices for Trash Reduction at Campbell Industrial Park. The project includes, but is not limited to: cleaning existing drainage structures; demolishing and removing existing metal screens at inlet openings of catch basins; installation of new automatic retractable screens; demolishing and reconstructing the entire top slab of existing catch basins; installation of catch basin nose plates; installation of stainless-steel storm drain markers; and installation of bollards and warning signs.
Bid Results
Industrial
$3,649,999.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
