BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Provide Labor and Materials Gross removal and disposal of layered asbestos containing flooring materials per CPS specification 02 82 14 and all applicable EPA, OSHA, IDPH and City of Chicago Asbestos Regulations. All work performed by an IDPH licensed Asbestos Contractor. All work shall be completed in NTE 12 consecutive Work Shifts (Monday through Friday). All work per TEM Environmental Project Manual dated April 1, 2026. All work shall be complete on or before July 15, 2026. Bogan HS - Flooring Abatement. Bids must be submitted electronically. Only Prequalified Pool Environmental Contractors may participate. Pre-qualification requirements: ONLY PREQUALIFIED POOL Environmental Contractors.

Bid Results

Educational

$500,000.00

Public - City

Renovation

4

8

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
592
Active Projects
300
Bidding Soon
4,620
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

June 1, 2026

Project location map

3939 W 79th St, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.