Published May 1, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a water / sewer project in Superior, Wisconsin. Completed plans call for the construction of a water / sewer project; and water / sewer project.

The work includes construction of a new chemical feed building (STR 50) at the wastewater treatment facility, which will be a 10-ft by 10-ft wood frame, metal exterior structure on a concrete slab with frost footings and a concrete stoop. The building will have drywall interior, metal siding exterior, a metal roof, and house a chemical feed pump skid, emergency eyewash and shower, automatic composite sampler, heating unit, and associated electrical equipment. A gravel pull-off for loading the chemical storage tank will be tied to the re-graveled access road. A new effluent pumping station (STR 60) will be constructed nearby, consisting of a 16-ft deep FRP combined valve vault and wet well containing two submersible pumps, ductile iron valving and piping, a pH sensor interlocked with the chemical feed skid, and associated electrical equipment. Approximately 5,000 linear feet of 6" HDPE forcemain will be installed from the pumping station to the new outfall at the Nemadji River, with passive air release stacks along the forcemain and directional drilling as the primary installation method. Forcemain segments under rail lines and State Highway 35 will be installed via jack and bore, with a 16-inch steel casing pipe beneath the rail lines. Additional work includes electrical upgrades to the main lift station building and emergency generator (STR 10), process piping and structural upgrades to the influent manhole (STR 11), main lift station wet well (STR 12), main lift station valve vault (STR 13), influent flow metering chamber (STR 14), and existing outfall flow metering chamber (STR 14). Bidders must submit a certified check or bid bond equal to at least 5% of the bid. No bid may be withdrawn within 60 days after opening. Minimum wages must comply with Federal Davis Bacon Wage Rates. Contractors must comply with the "Use of American Iron and Steel" provision. Disadvantaged Business Enterprises, including MBEs, WBEs, and SBRAs, are encouraged to submit bids and these requirements also apply to subcontracts. The Owner reserves the right to waive informalities or reject any or all bids. Contact information and submittal procedures for such questions are as follows: A. MSA Professional Services 1835 N Stevens Street Rhinelander, WI 54501 Pat Morrow, P.E. 715-362-3244 pmorrow@msa-ps.com Questions received less than seven days prior to the date for opening of Bids may not be answered.

Bid Results

Water / Sewer

$3,997,649.00

Public - City

New Construction, Site Work

34

44

21

5

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 29, 2026

Project location map

To Be Determined, Superior, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.