Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 20, 2026 at 8:00 PM
Updated May 20, 2026
Demolition, site work and addition to a municipal facility in Superior, Wisconsin. Completed plans call for the addition of a 1,800-square-foot municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.
In general, the work consists of an addition of approximately 1,800 SF to the existing NERR Building located at 14 Marina Drive, Superior, WI. The work includes site preparation and includes some selective demolition of the existing building and selective mechanical, electrical, and plumbing systems. New work includes sitework, landscaping, concrete foundations and slab-on-grade floor, wood framed walls, window systems, wood trusses, insulation, metal exterior siding and roofing, new interior walls, doors, ceilings and finishes. New and modified mechanical, electrical, plumbing systems and solar power systems as indicated in the documents. It is the bidders sole responsibility to review the Addenda tab during the bidding process for new postings. The Owner, Architect, General Contractor, Printer, or PlanRoom will not be responsible for bids or sub-bids based on single drawings, specification sheets or observation or use of partial sets of documents. It is the bidders sole responsibility to review and understand all project requirements prior to submitting a bid. The contact person is Kevin Allebach at 46 HGA, Inc., 333 East Erie Street, Milwaukee, WI. Architects Phone: 414-520-6513. Any other questions related to this project can be sent via email to the Procurement contact Lindsay Woznick at 49 Lindsay.woznick@wisconsin.edu. Bid-Results:- 1. General Prime Contractor-Rhom Construction, LLC-$799,985 2. Heating, Ventilating & AC-Stack Brothers Mechanical-$241, 920 3.Electrical -Stack Brothers Mechanical-$132,000
Award
Municipal
$799,985.00
Public - State/Provincial
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2026
April 30, 2026
14 Marina Dr, Superior, WI
Related To This Project
Superior, WI
Bid Date: Mar 24 2026
Superior, WI
Bid Date: Mar 24 2026
Superior, WI
Bid Date: Apr 28 2026
Superior, WI
Bid Date: Apr 30 2026
Superior, WI
Bid Date: May 08 2026
Superior, WI
Bid Date: May 26 2026
Superior, WI
Bid Date: May 21 2026
Superior, WI
Bid Date: Jun 02 2026
Superior, WI
Bid Date: Jun 09 2026
Superior, WI
Bid Date: Mar 12 2026
Superior, WI
Bid Date: Feb 26 2026
Superior, WI
Bid Date: Mar 06 2026
Superior, WI
Bid Date: Mar 10 2026
Superior, WI
Bid Date: Mar 20 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
