BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a mixed-use development in Brockville, Ontario. Completed plans call for the renovation of a educational facility.

The Catholic District School Board of Eastern Ontario invites qualified contractors to submit quotations for the RTU Replacement & BAS Upgrade Project at St. Francis Xavier Catholic School, 74 Church Street, Brockville, Ontario. The work includes the removal of the existing Trane Rooftop Unit (RTU), which is currently at end-of-life, and the supply and installation of a replacement Trane RTU. The project also includes revisions to the existing BAS (Building Automation System) sequences to incorporate demand-controlled ventilation (DCV). The contractor must perform all required demolition of existing infrastructure and provide new infrastructure as outlined in the mechanical and electrical discipline design drawings. The successful bidder is responsible for carrying the costs associated with structural review, engineering, and reinforcement of the existing roof structure and equipment curb(s), including sealing and flashing of existing penetrations as noted on the mechanical design drawings. Attendance at the mandatory site meeting is required for bid eligibility; subcontractors are not required to attend and their attendance will not count toward bidder compliance. Question Deadline 04/21/2026 at 12:00 PM ET Questions and clarifications will only be received and answered via online. Documents can be obtained from https://www.biddingo.com/ Site Meeting Site Meeting Date 04/15/2026 11:00:00 AM ET (MM/DD/YYYY) Location: 74 Church Street , Brockville, Ontario K6V 3X6 Canada Mandatory Details: The work includes the removal of the existing Trane Rooftop Unit (RTU), which is currently at end-of-life, and the supply and installation of a replacement Trane RTU including revisions to the existing BAS sequences to incorporate demand-controlled ventilation (DCV). The contractor shall include all required demolition of existing infrastructure and provision of new infrastructure for the work at hand for all disciplines as outlined in the mechanical and electrical discipline design drawings. The successful bidder is responsible to carry the costs associated with structural review, engineering, and reinforcement of existing roof structure and equipment curb(s) including sealing and flashing of existing penetrations as noted on mechanical design drawings. The existing wing of the school within the main scope of work area is a flat roof section where the replacement unit is currently located at. This project is subject to funding.

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Renovation

6

5

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
138
Bidding Soon
1,095
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

June 29, 2026

Project location map

74 Church St, Brockville, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.