BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 19, 2026

Renovation of a communication facility in San Luis Obispo, California. Completed plans call for the renovation of a 361-square-foot communication facility.

The subcontractor shall furnish all labor, materials, equipment, supervision, and all other services required to replace the roof at the San Luis Obispo ATCT cab. The work includes removal and disposal of the existing roofing system from the ATCT cab roof, which is approximately 361 square feet, and installation of a new roofing system in accordance with the project requirements. The scope includes providing and installing a roof hatch guardrail kit with a self-closing gate and galvanized finish to meet code compliance, removing and replacing all roof drains, and removing and replacing the roof hatch. The contractor shall also remove and relocate the grounding counterpoise from the roof to the parapet wall. All debris and trash generated by the work shall be removed daily and disposed of in accordance with all applicable local and state requirements. The attached drawings are provided for reference only. The Contractor shall begin performance within 30 calendar days and complete it within 90 calendar days. Questions are due NLT April 23, 2026 Proposals are due on May 4, 2026 1200 EST ,Email to Rodgers.l.cox@faa.gov magnitude between $50,000 and $200,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Scope of Work All work must be performed in accordance with the Attachments set forth in Section J of this Solicitation. The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only. Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: i Remove and dispose of existing roofing system from the SBP ATCT cab roof. i Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. i Remove and replace all roof drains. i Remove and replace roof hatch i Remove and relocate grounding counterpoise from roof to parapet wall. i Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily. All safety, security, and protections rules and regulation required by the federal, state and local entities shall be followed and adhered to. Any deviation from these rules may result in work stoppage by the FAA COR Clause List The remainder of this page has been intentionally left blank.

Post-Bid

Communication

$200,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

June 3, 2026

Project location map

903 Airport Dr, San Luis Obispo, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.