BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of an elderly care / assisted living facility in Decatur, Georgia. Completed plans call for the construction of a elderly care / assisted living facility; and elderly care / assisted living facility.

Claratel Behavioral Health is seeking sealed proposals from qualified Construction Professionals for the construction of: Claratel Care Homes. The delivery method is Construction Manager at Risk hereafter referred to as CMAR. Claratel Behavioral Health is planning a comprehensive improvement to the existing property located at 3053 Wesley Chapel Road. This project will transform the existing property into a functional neighborhood by completing the development of the existing property, constructing (2) home sites, green space areas, and parking lots (See Attachment B). The intent is to create a durable, well-constructed, and architecturally cohesive neighborhood that will assist and meet the needs of Claratel Behavioral Health and their clients. CMAR will be required to permit the project with the appropriate government authority. Owner has right to change budget or schedule at their discretion. PROJECT DETAILS: Re-grading and reworking existing lots to meet new layout requirements Installation of parking lots Installation of new road Curb and Gutter Installation of utilities not provided to the site Construction of (2) new homes that meet Georgia DBHDD and Claratel Behavioral Healths requirements for individuals with acute behaviors Construction of (1) new Multi-Purpose Building that meets Georgia DBHDD and Claratel Behavioral Healths Requirements (I think this is Phase II) Fencing Concrete walks Turf establishment Landscaping Outdoor recreational area with walking trail and half-basketball court ANTICIPATED SCHEDULE The Owner intends to award the contract for the Project within one month of the proposal submittal deadline. After the award, the CMAR will have seven days to execute the contract. All times are EST. Schedule details included in the Bid Any explanations desired by a bidder regarding the meaning or interpretation of this Request for Quote, drawings, specifications, etc., must be in writing and submitted to the email address below by Friday, April 24, 2026 at 4:00 PM. If any statement in the bidding documents, specifications, plans, etc., appear ambiguous to the bidder, the bidder is specifically instructed to make a written request to the Claratel Behavioral Health. The request must be addressed as follows: CLARATEL BEHAVIORAL HEALTH ATTN: TEIRESIAS JONES, SR TEIRESJ@CLARATEL.ORG PROJECT DETAILS: _ Re-grading and reworking existing lots to meet new layout requirements _ Installation of parking lots _ Installation of new road _ Curb and Gutter _ Installation of utilities not provided to the site _ Construction of (2) new homes that meet Georgia DBHDD and Claratel Behavioral Health's requirements for individuals with acute behaviors _ Construction of (1) new Multi-Purpose Building that meets Georgia DBHDD and Claratel Behavioral Health's Requirements (I think this is Phase II) _ Fencing _ Concrete walks _ Turf establishment. _ Landscaping _ Outdoor recreational area with walking trail and half-basketball court

Post-Bid

Elderly Care / Assisted Living

$1,655,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
190
Bidding Soon
2,306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

July 3, 2026

Project location map

3053 Wesley Chapel Rd, Decatur, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.