BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a power facility in Rufus, Oregon. Working plans call for the renovation of a power facility.

HVAC upgrades at the John Day Dam Powerhouse, including complete replacement of the primary chilled water system and installation of secondary chillers serving the majority of the powerhouse galleries. The work includes demolition and removal of existing systems and installation of four new chiller skid packages totaling approximately 600 tons of refrigeration capacity, new electrical feeds, chilled water pumps, piping, air handler units, and selective reuse of existing components. All systems shall be integrated into a new automated digital HVAC control system. Half of the new systems will be water-cooled and half air-cooled, including installation of roof-mounted air-cooled condensers with required roof penetrations, piping, and building modifications. Additional work includes new intake and exhaust ducting to prevent smoke propagation, fire protection measures at all penetrations, full integration of HVAC and building fire protection systems with replacement of pneumatic controls, provisions for free cooling using outside air, modifications to intakes and louvers for smoke ventilation, installation of localized HVAC units such as mini-splits, and integration of all systems into centralized controls. The project requires extensive structural modifications, potential asbestos abatement and lead mitigation, and performance of work in an active operational powerhouse with significant electrical and safety constraints. All refrigerants used must not be subject to future phase-out schedules. The estimated magnitude of construction is between $25M and $100M. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Power Plant

$100,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2026

Project location map

26969 Great Northern Road, Rufus, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.