Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 24, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a power facility in Rufus, Oregon. Working plans call for the renovation of a power facility.
HVAC upgrades at the John Day Dam Powerhouse, including complete replacement of the primary chilled water system and installation of secondary chillers serving the majority of the powerhouse galleries. The work includes demolition and removal of existing systems and installation of four new chiller skid packages totaling approximately 600 tons of refrigeration capacity, new electrical feeds, chilled water pumps, piping, air handler units, and selective reuse of existing components. All systems shall be integrated into a new automated digital HVAC control system. Half of the new systems will be water-cooled and half air-cooled, including installation of roof-mounted air-cooled condensers with required roof penetrations, piping, and building modifications. Additional work includes new intake and exhaust ducting to prevent smoke propagation, fire protection measures at all penetrations, full integration of HVAC and building fire protection systems with replacement of pneumatic controls, provisions for free cooling using outside air, modifications to intakes and louvers for smoke ventilation, installation of localized HVAC units such as mini-splits, and integration of all systems into centralized controls. The project requires extensive structural modifications, potential asbestos abatement and lead mitigation, and performance of work in an active operational powerhouse with significant electrical and safety constraints. All refrigerants used must not be subject to future phase-out schedules. The estimated magnitude of construction is between $25M and $100M. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Power Plant
$100,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2026
26969 Great Northern Road, Rufus, OR
Related To This Project
Rufus, OR
Bid Date: May 20 2026
Rufus, OR
Bid Date: Feb 25 2026
Rufus, OR
Bid Date: Mar 06 2026
Rufus, OR
Bid Date: Sep 22 2025
Rufus, OR
Bid Date: Sep 05 2025
Rufus, OR
Bid Date: Jul 14 2025
Rufus, OR
Bid Date: Jun 04 2025
Rufus, OR
Bid Date: Apr 03 2025
Rufus, OR
Bid Date: Sep 23 2021
Rufus, OR
Bid Date: Sep 15 2023
Rufus, OR
Bid Date: Nov 13 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
