Published May 1, 2026 at 8:00 PM

Updated May 20, 2026

Site work, paving and new construction of a transportation facility in Wahoo, Nebraska. Completed plans call for the construction of a transportation facility; for paving for a transportation facility; and for site work for a transportation facility.

The improvements to be constructed include constructing a pre-engineered steel hangar building, constructing taxilanes and ramps, and placing pavement markings. Bidders are required to furnish all labor, materials, and equipment, and to perform all necessary work for the project. Bids must include a guaranty of five percent of the total bid amount and can only be submitted by those obtaining bid documents directly from QuestCDN or Kirkham Michael. The project is subject to Davis-Bacon Act wage provisions, Disadvantaged Business Enterprise participation requirements under 49 CFR Part 26, and various other federal contract conditions. The Wahoo Airport Authority reserves the right to reject any and all bids and to waive any informality in the bids received. Question Deadline 04/20/2026 Questions regarding bids shall be directed to Cory Gaston at cgaston@kirkham.com and Alexa Hazelton at ahazelton@kirkham.com no later than seven (7) calendar days prior to the bid opening. Each bid must be accompanied by a bid guaranty in the amount of five (5) percent of the total amount of the bid. The bid guaranty may be by cashier's check, certified check or bid bond made payable to the Wahoo Airport Authority. Bids may be held by the Wahoo Airport Authority for a period not to exceed ninety (90) days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. The right is reserved, as the Wahoo Airport Authority may require to reject any and all bids and to waive any informality in the bids received. This project is subject to the requirements of the Davis-Bacon Act, as amended. The Contractor is required to comply with wage and labor provisions and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor. This project is subject to the requirements of 49 CFR Part 26 Disadvantaged Business Enterprise Participation. The owner has established a contract goal of 0.0% participation for small business concerns owned and controlled by qualified Disadvantaged Business Enterprises (DBE) due to the Interim Final Rule (IFR) issued in October 2025. The bidder shall make and document good faith efforts, as defined in Appendix A of 49 CFR Part 26, to meet the established goal. Award of contract is also subject to the following federal provisions: o DOL Regulation 29 CFR Part 5 - Davis Bacon Act o DOT Regulation 49 CFR PART 29 - Governmentwide Debarment and Suspension and Governmentwide Requirements for Drug-free Workplace o DOT Regulation 49 CFR PART 30 - Denial of Public Works Contracts to Suppliers of Goods and Services of Countries that Deny Contracts to Suppliers of Goods and Services of Countries that Deny Procurement Market Access to U.S. Contractors (Foreign Trade Restriction) o TITLE 49 United States Code, CHAPTER 501 - Buy American Preferences o 31 U.S.C. 1352 - Byrd Anti-Lobbying Amendment; 2 CFR part 200, Appendix II (J); and 49 CFR part 20, Appendix A o Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act and the regulatory provisions of 40 CFR Part 247 o Title VI of the Civil Rights Act of 1964 (49 USC 47123 and FAA Order 1400.11)

Bid Results

Transportation Terminals

$1,521,771.00

Public - City

New Construction, Paving, Site Work

19

17

26

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2026

June 26, 2026

Project location map

1464 34th St, Wahoo, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.