BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Wayland, Michigan. Completed plans call for site work for a water / sewer project.

The work consists of cyclical equipment replacement at Lift Station #7 on Reno Drive in the City of Wayland including submersible pump replacement, check valve replacement, natural gas generator replacement, the addition of a radar level sensor and controller, and various appurtenances. Bidders are instructed to submit a certified check or bank draft payable to the owner or a satisfactory bid bond in the amount of 5 percent of the bid. No bids may be withdrawn for at least ninety days after the scheduled closing time. The successful bidder must furnish a satisfactory Performance Bond and a Labor and Material Bond in the amount of 100 percent of the contract price. The use of local contractors and labor is encouraged. Work Included: The item of Remove & Replace Ex. Generator includes the removal of the existing generator, furnishing and installation of a complete standby power generator together with a disconnect switch, an automatic transfer switch and other appurtenances as required. This shall include standby generator, electrical, control system, fuel lines including natural gas connection, housing, all required wiring modifications to connect to the existing electrical systems, all restoration, etc. and other work and materials necessary to install complete and ready for operation, the standby generator as shown on the plans and as specified. The work shall also include transporting the existing generator to the Wayland DPW Garage located at 965 S. Main Street, Wayland, MI 49348. The item of Remove & Replace Ex. Automatic Transfer Switch includes the removal of the existing automatic transfer switch, furnishing and installation of a complete automatic transfer switch other appurtenances as required. This shall include all required wiring modifications to connect to the existing electrical systems, all restoration, etc. and other work and materials necessary to install complete and ready for operation, the automatic transfer switch. The work shall also include transporting the existing automatic transfer switch to the Wayland DPW Garage located at 965 S. Main Street, Wayland, MI 49348.

Bid Results

Water / Sewer

$307,000.00

Public - City

Site Work

4

13

4

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2026

May 27, 2026

Project location map

965 S Main St, Wayland, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.