Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 7, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a fitness / recreation center in Butte, Montana. Conceptual plans call for the renovation of a fitness / recreation center.
Programming and design of a modernization to the HPER Complex, including but not limited to: a retirement of the existing pool and conversion to an auxiliary student gym; expanded locker rooms, in part to address Title IX expectations regarding gendered facilities; an expansion of support space to meet the needs of a growing student-athlete population; and creating flexible use spaces to address operational efficiency on campus and provide event-hosting capabilities. Firms wishing to submit an RFQ for this project need to be aware of the accelerated timeline of early design; a concept design needs to be created in June 2026 to be presented to the Board of Regents in July 2026. The construction cost is estimated at $3,520,000, plus additional project costs. The Architecture & Engineering Division is accepting qualifications for architectural and engineering services for the Montana Tech – HPER Complex Renovation Project in Butte, MT. Firms interested in being considered must submit Form 115 through the State’s eMACS system. Information in addition to the 115 is acceptable. Submissions must be submitted no later than 2:00 p.m. on Thursday, April 23, 2026. Submissions received after the deadline may result in rejection. The procedure for selection will be in accordance with 18-8-204 MCA. Firms selected for an interview will be given project-specific initial information, interview topics/questions, and the interview schedule. Selected firms will present their credentials before an interview committee, which will then submit the names of three qualified firms to the Department of Administration Director, who will appoint one firm for the project in accordance with 18-2-112 MCA. Question Deadline 04/16/2026 at 2:00 PM MT The method of Contractor Selection has not been Determined at this time. Request for Proposal for Design Services is Underway
Conceptual
Fitness / Rec Centers
$3,520,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 22, 2026
HPER W Park St, Butte, MT
Related To This Project
Butte, MT
Bid Date: Apr 29 2026
Butte, MT
Bid Date: Apr 29 2026
Butte, MT
Bid Date: Apr 16 2026
Butte, MT
Bid Date: May 06 2026
Butte, MT
Bid Date: May 06 2026
Butte, MT
Bid Date: Mar 26 2026
Butte, MT
Bid Date: Mar 26 2026
Butte, MT
Bid Date: Mar 20 2026
Butte, MT
Bid Date: Mar 13 2026
Butte, MT
Bid Date: Mar 26 2026
Butte, MT
Bid Date: Feb 18 2026
Butte, MT
Bid Date: Mar 13 2026
Butte, MT
Bid Date: Feb 25 2026
Butte, MT
Bid Date: Feb 25 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
