BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a transportation facility in Sumter, South Carolina. Completed plans call for site work for a transportation facility.

Sumter County intends to update the taxiway geometry at one end of Taxiway A to comply with current FAA horizontal geometry standards. The existing taxiway width will be maintained, with widening provided as necessary to meet the required geometry. The project will include pavement widening consisting of compacted subgrade, aggregate base course, and asphalt pavement. In addition, the project will include dewatering, lighting and electrical improvements, erosion control measures, pavement markings, and grassing/sodding. A Microsoft Teams link will be sent to all plan holders prior to the pre-bid conference. Attendance in person by Prime Contractors is NOT required to bid on this project but is recommended. The purpose of the conference isto highlight the Project and explain pertinent FAA regulations as well asthe Airport's safety, security, and procurement processes. Question Deadline 04/17/2026 at 5:00 PM ET Questions of a technical nature should be directed to Ben Cagle electronically via email to bcagle@holtconsultingco.com.

Bid Results

Transportation Terminals

$480,145.00

Public - County

Site Work

23

8

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

May 21, 2026

Project location map

2945 Airport Rd, Sumter, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.