Renovation of an educational facility in Toledo, Ohio. Completed plans call for the renovation of a educational facility.
TPS TCPM Repair Phase 1 Bowsher - Rogers. Planholders are required to pay shipping, handling and tax when applicable. Prices on the planroom do not represent these charges. General - [Base & Alt Scopes Combined], refer to all OPR documents issued: a. Proposal Breakdown/Project Sites for Phase 1 Group REPAIRS: 1) BASE Item 1: Bowsher High School Plus Five Feeder Sites (SIX Total): a) Arlington Elementary School. b) Beverly Elementary School. c) Burroughs Elementary School. d) Byrnedale Elementary School. e) Walbridge Elementary School. 2) BASE Item 2: Rogers High School Plus Five Feeder Sites (SIX Total): a) Hawkins STEAM School. b) Keyser Elementary School. c) McTigue Junior High School. d) Reynolds Elementary School. e) Escuela SMART Academy. 3) BASE Item 3: COMBINED Bowsher & Rogers Groups (TWELVE Total). b. Overall Scopes of Work & Upgrades (coordinated with accompanying specifications, issued Drawing Set(s) & Exhibits-Reference Documents: 1) Designated HVAC Control/Operational Technology System REPAIRS (Replacement of designated Temperature Control Systems/Master Systems Integration Components (TCS/MSI) and designated Air Flow Measuring Stations (AFMS) and other as noted): a) Ensure that each designated Operational Technology System/Network (including, but not limited to HVAC Control, Alarm & Lighting Control Systems) is properly assessed, evaluated & designed for scheduled Replacement/upgrade to be fully-installed by Contractor with coordination from required agents. Coordinate both APPLIED/UNITARY & Communication Controls Interface with Master Systems Integrator (MSI). Test, Adjust, Balance & Commission upgraded Operational Technology Systems as required/noted. 2) ALTERNATE ITEMS: Coordinate Proposals with published OPR Documents - Bid Form and Schematic Drawings: a) ALT-1: Provisions for inclusion of LIGHTING CONTROLS System Updates as designated. b) ALT-2: Provisions for inclusion of HVAC PIPING, IAQ and IT AC System Updates as designated. The purpose of this Overall Specification Section is to describe the project's main intent, to establish main boundaries of responsibilities, and to reasonably narrow the not-yet-made choices of the proposers according to Owner-driven Criteria & Project intents: 1. Basic Form of Contract - Design-Build Contractor, direct to Owner, with GuaranteedMax-Price (matched to Scope, Schedule and Agreed-to clarifications). Mechanical/Service Trades is expected to be primary with General/Plumbing/Electrical as secondary under a Performance-Based Agreement using Owner-furnished schematic design/criteria and certain Owner-evaluated equipment and services as noted.2. Demolition: Design-Builder is responsible for the demolition of materials/equipment affecting the Scopes of Work. The Design-Builder will assess/direct/monitor ALL Asbestos-related abatements required. a. Coordinate Salvage Rights of Owner with Owner's designated representative prior to removals and disposals. Items not claimed by Owner through this process shall be completely removed and properly disposed. 1) Contractor shall provide a complete (by official Transmittal to & Signed-off by Owner) Inventory of Demolished materials/items designated as "Salvaged-Retained-by-Owner", including but not limited to: Descriptions, Make/Model Numbers, Serial Numbers, Quantity, etc. 3. General Trades Scope of Work - furnished by Design-Builder as appropriate for the work. This may include, but is not limited to: a. Complete Final design and build and applicable Project Coordination for intended Scope of Work noted in schematic documents and descriptions, including, but not limited to the preparation of drawings (support-pertinent-trades) for the purpose of obtaining a valid Occupancy condition for the Owner (permit, inspections, approvals, etc.). b. Coordination with Owner/Owner's Representative teams on Project Schedule and Work Progress Plans (locations, areas, tie-ins, etc.). c. New Construction: None Anticipated. d. Existing Interior Partition modifications required by intended New Layout Scopes of Work (walls, ceilings, flooring, etc.): 1) Planned activities include only minor modifications to existing soffits/partitions as necessary in affected designated areas, with coordination for Mechanical/Electrical installations required for Scope by this DesignBuilder; return to existing conditions. e. Structural Support modifications/additions (miscellaneous concrete and structural steel): modify existing infrastructure and add new support as required to properly install/complete renovations and Mechanical Equipment/Systems. 1) Both Engineering Design and Means & Methods for all structural items required by the new & modified Scopes are a part of the Performance-Based proposals. f. Site modifications required by intended Scope of Work (lawns, planters, pavement, etc.): No New major Work intended, Return to Existing Conditions unless noted otherwise. 4. Plumbing Trades Scope of Work - furnished by Design-Builder as appropriate for the work. No Work intended beyond what is required by Mechanical/Electrical Scopes of Work. 5. Mechanical Trades Scope of Work - furnished by Design-Builder as appropriate for the work. This may include, but is not limited to: a. Complete Final design and build and applicable Project Coordination for intended Scope of Work noted in schematic documents and descriptions, including, but not limited to the preparation of drawings (All-pertinent-trades) for the purpose of obtaining a valid Occupancy condition for the Owner (permit, inspections, approvals, etc.). 1) Both Engineering Design and Means & Methods for all Mechanical items required by the new mechanical systems Scope are a part of the Performance-Based proposal. Mechanical Contractor's HVAC equipment/systems choices in the proposal will be shared & coordinated with each trade both prior to and subsequent to the final Proposal, referenced to schematic plans/documents published. Post-Proposal and after award of D-B contract(s), the Proposer shall also share the design choices with the Owner's Master Systems Integrator/Commissioning Provider for coordination and planning functions. b. Coordination with Owner/Owner's Representative teams on Project Schedule and Work Progress Plans (locations, areas, tie-ins, etc.). c. Complete Installation (materials and labor) of both Owner-provided/preferred Equipment and Systems and Sub-Contractor-furnished items. 6. Electrical Trades Scope of Work - furnished/coordinated by Design-Builder as appropriate for the work. This may include, but is not limited to: a. Complete Final Design and Overall Coordination for intended Scope of Work noted in schematic documents and descriptions. 1) Both Engineering Design and Means & Methods for all Electrical items required by the new Scopes are a part of the Performance-Based proposal. Electrical Contractor will use Design-Build Team's coordinated design & Mechanical Contractor's HVAC equipment/systems choices in the proposal and evaluate the electrical power system re-works that are required, coordinated with schematic plans/documents published. 2) Both Engineering Design and Means & Methods for all Electrical items required by the new Power, Operational Technology/HVAC/IAQ Systems, and Low-Voltage Line Power requirements (see below paragraphs) Scopes is a part of the Performance-Based proposal. Electrical/Design-Build Contractor will use documents in the OPR and field information and evaluate the electrical power system re-works that are required, coordinated with schematic plans/documents published. 3) Both Engineering Design and Means & Methods for all newly-affected Electrical Low-Voltage Systems including any required modifications to existing Fire Alarm System required by the new Scopes are a part of the Performance-Based proposal. Electrical Sub-Contractor will use DesignBuilder's coordinated design and Mechanical Sub-Contractor's HVAC equipment/systems choices in the proposal and evaluate the existing system re-works that are required, coordinated with schematic plans/documents published. a) Design-Builder provides Electric Power Raceway-Conductor Infrastructure for each affected system including, but not limited to: Information Technology (including BAS Network items, new OT/VFD/IAQ Systems, etc.), as applicable. b. Coordination with Project Team on Project Schedule and Work Progress Plans (renovation locations, areas, tie-ins, etc.). c. Complete Installation (materials and labor) of both Owner-provided/preferred Equipment and Systems and Design-Builder/Mechanical Contractor-furnished items. New Work only as required to update/modify existing electrical power infrastructure to accommodate New Operational Technology System(s) Scopes & Renovations and designated BAS Panels/Components/Environmental Sensor additions. 1) Conduit/wiring penetrating from ceiling spaces thru occupied floor spaces should be located to minimize interruption to use of prime floor space and finished to match the current decor in the spaces chosen for the pathways. 7. Temperature Control Systems - Main system is furnished by Design-Build Contractor using Owner's Master Systems Integrator and physically installed by the D-B/Proposer, unless specifically noted otherwise on schematic drawings. Items furnished by Bidder's Mechanical/Electrical Vendor(s) and installed by Bidder's Sub-Contractor(s) to include, but not be limited to: a. Packaged Unitary Controls (components and HVAC Equipment such as VFDAFMS IAQ Systems wiring) as part of a selected Vendor system, with provisions for OPEN Systems Integration as noted. b. Temperature-Pressure Sensors/Relays, control valves and necessary operational components for each Applied/Vendor-driven System in the Scope of Work. Items furnished by Bidder/Proposer's Electrical Sub-Contractor and installed by Electrical Sub-Contractor to include, but not be limited to: c. Low Voltage wiring for Unitary-provided systems (i.e., HVAC/Lighting Control, VFD-AFMS IAQ System Safeties, Interlocks & Controls, etc.). d. OPEN Systems Integration wiring components (BacNet(TM)/Serial Communications cabling and cable/raceways for low voltage components required.). e. Physical installation of OPEN Operational Technology Systems components provided by Master Systems Integrator as noted (HVAC, Lighting Control, IAQ Monitoring, Environmental Sensor-controllers, Main OPEN Architecture Controllers, etc.). Items furnished by Contractor and installed/Commissioned by Contractor via the Master Systems Integrator to include, but is not limited to: f. Main Computer & Energy Management Software, Integration to Packaged Unitary Controls (vendor-provided-level) and applicable BAS Network Systems, etc. to complete the designed OPEN Systems Architecture and Integration. 8. Fire Alarm Systems - No New Work expected beyond the Contractor's Renovationfocused Scope noted, applicable items furnished and installed by Contractor (alarm devices, Safety devices, controls, etc.), unless noted otherwise. - Return to Existing Conditions using existing installed/functioning system. 9. Sprinkler Systems - Applicable items furnished and installed by Design-Builder (water sprinklers, piping, controls, etc.). New Work intended includes that which affects the new mechanical equipment/systems and routing paths - Provide for current Occupancy requirements unless noted otherwise.
Post-Bid
Educational
$1,070,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2026
May 26, 2026
Multiple Locations, Toledo, OH
Related To This Project
Toledo, OH
Bid Date: May 26 2026
Toledo, OH
Bid Date: May 19 2026
Toledo, OH
Bid Date: May 19 2026
Toledo, OH
Bid Date: May 19 2026
Toledo, OH
Bid Date: May 08 2026
Toledo, OH
Bid Date: May 08 2026
Toledo, OH
Bid Date: May 26 2026
Toledo, OH
Bid Date: May 19 2026
Toledo, OH
Bid Date: May 19 2026
Toledo, OH
Bid Date: May 19 2026
Toledo, OH
Bid Date: May 12 2026
Toledo, OH
Bid Date: May 12 2026
Toledo, OH
Bid Date: May 19 2026
Toledo, OH
Bid Date: May 13 2026
Toledo, OH
Bid Date: Jun 02 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.