Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 16, 2026
Site work and addition to a mixed-use development in Corning, Arkansas. Completed plans call for the addition of a industrial development; and office development.
The Project consists of the following: performing all site work; pouring concrete slab and foundations; connecting water and sewer to existing service lines and roughing into concrete slab; providing electric service to the building; constructing the engineered, pre-fabricated metal building (including insulation) as shown on the drawings; and, other related appurtenances. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. Questions received after 16th April 2026 may not be answered.
Bid Results
Industrial
$212,000.00
Public - City
Addition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2026
May 25, 2026
To Be Determined, Corning, AR
Related To This Project
Corning, AR
Bid Date: Mar 04 2026
Corning, AR
Bid Date: Feb 10 2026
Corning, AR
Bid Date: Feb 05 2026
Corning, AR
Bid Date: Oct 14 2025
Corning, AR
Bid Date: May 23 2025
Corning, AR
--
Corning, AR
Bid Date: Apr 10 2025
Corning, AR
Bid Date: Feb 25 2025
Corning, AR
Bid Date: Jan 15 2025
Corning, AR
Bid Date: Oct 29 2024
Corning, AR
Bid Date: Jul 09 2024
Corning, AR
Bid Date: Jun 04 2024
Corning, AR
Bid Date: Aug 08 2024
Corning, AR
Bid Date: Apr 18 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
