Site work for a power facility in Greenville, North Carolina. Completed plans call for site work for a power facility.

The purpose of this document is to detail the technical specifications and requirements for the Boviet Substation foundations. The work shall include furnishing all materials, supervision, labor, tools, equipment, and supplies necessary for the complete installation of the foundation and conduits as shown or called for in the Drawings and/or Specifications. The Contractor will be responsible for any demolition/hauling/disposal of all spoils. 1.1 Bids will be received on one (1) Bid Schedule for Boviet Substation foundations. 1.) Site work associated with the installation of the new foundations. 2.) Demolition hauling and disposal of all spoils. 3.) Labor. 1.2 The desired project timeline for completion of work is eight (8) weeks from notice to proceed. 1.3 Installation of all piers greater than 30” diameter require use of permanent casings or slurry mix for placement.Permanent casings placed through impact or vibration may be quoted as an alternate method, and will require evaluation and approval by the Owner. 1.4 Seasonal high-water-table exists at 18” below surfance and efforts to mitigate its effects shall be considered. Time is of the essence, and it is critical that the work be performed on schedule and time is allowed for the completion of the work in the Contract Agreement included herewith. Damages for delay shall be at the rate of four-thousand dollars ($4,000.00) per calendar day for failure of the Contractor to complete the work within the Construction Schedule. No credit shall be given for early completion of the work. Questions regarding this bid request should be directed to Cleve Haddock, Procurement Manager, Finance Department at (252) 551-1533, haddocgc@guc.com. All questions must be received via e-mail by or before 5:00pm (EDT) April 28, 2026. GUC reserves the right to reject any and all bids, to waive any and all informalities, and to disregard all nonconforming or conditional bids or counter proposals.

Post-Bid

Power Plant

$1,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
77
Bidding Soon
918
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 5, 2026

Project location map

1125 Sugg Pkwy, Greenville, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.