BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a sidewalk / parking lot in Evanston, Wyoming. Completed plans call for site work for a sidewalk / parking lot.

The work shall include all labor, material, equipment, and incidentals necessary to complete this turnkey project, which includes demolition of an existing brick and mortar, backed by a concrete stem wall, retaining wall (the wall is to be cut horizontally, leaving roughly the bottom half in place), demolition of an existing storm drainage system consisting of PVC pipe and concrete catch basins, demolition of concrete gutters, sidewalks, and door landing, and removal of four trees. Installation shall include a rock boulder retaining wall, including excavation, grading, backfilling with native soil and gravels, geotextile fabrics, drainage piping, and xeriscape, with construction of the wall specific to competent durable boulders as called out in the design package; site slope repairs, including excavation, grading, backfilling with native and imported materials, turf reinforcement mats, geosynthetics, anchorage, and rock boulder-lined drainage swales; and site drainage improvements along the north and east sides of the structure, including excavation, grading, new PVC catch basins, 8-inch diameter ADS, and 6-inch PVC pipe, and replacement of concrete gutters, sidewalks, and door landing. Bidders who are certified as a resident contractor by the State of Wyoming will receive a five percent Wyoming Contractor Preference, as per Wyoming State Statutes. The City of Evanston reserves the right to reject any or all bids or any part of any bid, to waive any formality in any bid, as its best interest may appear. Question Deadline 04/29/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents through the Bidding Website. Questions received less than five days prior to the date for opening of Bids may not be answered. The Work will be substantially complete on or before November 5, 2026, Final completion- December 5, 2026.

Bid Results

Sidewalks / Parking Lot

$541,567.00

Public - City

Site Work

30

9

2

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
96
Bidding Soon
956
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

June 3, 2026

Project location map

275 Saddle Ridge Rd, Evanston, WY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.