Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 7, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a sidewalk / parking lot in Evanston, Wyoming. Completed plans call for site work for a sidewalk / parking lot.
The work shall include all labor, material, equipment, and incidentals necessary to complete this turnkey project, which includes demolition of an existing brick and mortar, backed by a concrete stem wall, retaining wall (the wall is to be cut horizontally, leaving roughly the bottom half in place), demolition of an existing storm drainage system consisting of PVC pipe and concrete catch basins, demolition of concrete gutters, sidewalks, and door landing, and removal of four trees. Installation shall include a rock boulder retaining wall, including excavation, grading, backfilling with native soil and gravels, geotextile fabrics, drainage piping, and xeriscape, with construction of the wall specific to competent durable boulders as called out in the design package; site slope repairs, including excavation, grading, backfilling with native and imported materials, turf reinforcement mats, geosynthetics, anchorage, and rock boulder-lined drainage swales; and site drainage improvements along the north and east sides of the structure, including excavation, grading, new PVC catch basins, 8-inch diameter ADS, and 6-inch PVC pipe, and replacement of concrete gutters, sidewalks, and door landing. Bidders who are certified as a resident contractor by the State of Wyoming will receive a five percent Wyoming Contractor Preference, as per Wyoming State Statutes. The City of Evanston reserves the right to reject any or all bids or any part of any bid, to waive any formality in any bid, as its best interest may appear. Question Deadline 04/29/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents through the Bidding Website. Questions received less than five days prior to the date for opening of Bids may not be answered. The Work will be substantially complete on or before November 5, 2026, Final completion- December 5, 2026.
Bid Results
Sidewalks / Parking Lot
$541,567.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2026
June 3, 2026
275 Saddle Ridge Rd, Evanston, WY
Related To This Project
Evanston, WY
Bid Date: Mar 25 2026
Evanston, WY
Bid Date: Feb 26 2026
Evanston, WY
Bid Date: Feb 26 2026
Evanston, WY
Bid Date: Feb 19 2026
Evanston, WY
Bid Date: Feb 27 2026
Evanston, WY
Bid Date: Feb 25 2026
Evanston, WY
Bid Date: Jan 20 2026
Evanston, WY
Bid Date: Feb 03 2026
Evanston, WY
Bid Date: Jan 27 2026
Evanston, WY
--
Evanston, WY
Bid Date: Nov 25 2025
Evanston, WY
Bid Date: Dec 09 2025
Evanston, WY
--
Evanston, WY
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
