Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 9, 2026 at 8:00 PM
Updated May 14, 2026
Site work and paving for a mixed-use development in Lees Summit, Missouri. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Scope of work Completion of a 1,600LF trail loop around the small pond at Central Park. Work to be completed includes: Curb cut & ADA ramp at beginning of trail off parking lot Provide cut & fill for ADA trail compliance coming off parking lot and grade all trail edges out to no greater than a 3:1 slope for mowing purposes and compact all loose soils to 95% in 4-inch lifts. Removal of approximately 395 cubic yards of subgrade along trail path to a depth of 8 inches and compaction of subgrade to 95% compaction Installation of approximately 400 tons of AB-3 base rock to a 4 compacted depth to 95% compaction & 10 feet wide throughout the distance of the entire trail Installation of approximately 325tons of Type 5-01 asphalt to a 4 compacted depth at 95% compaction & 8 feet wide throughout the distance of the entire trail meeting all ADA slope and cross-slope requirements. Provide and install topsoil for backfill around the entire trail Provide As-Built drawings that identify trail location and slope/cross slope for ADA compliance Provide all erosion controls Deadline for questions Monday, April 27, 2026 Any questions regarding this Request for Proposal shall be submitted to Justin Stuart by email at jstuart@bluespringsmo.gov or by phone at 816-228-0105 Updated quantities in Section II Scope of Work: Updated to 1,600 LF trail loop Updated to Removal of approximately 395 cubic yards of subgrade along trail path Updated to Installation of approximately 400 tons of AB-3 base rock Updated to Installation of approximately 325 tons of Type 5-01 asphalt The City reserves the right to reject any or all proposals and to waive informalities or deficiencies therein to negotiate with any or all bidders or others for more favorable terms or prices and to award a contract to other than the bidder submitting the lowest cost bid proposal with or without negotiation and to determine which is the lowest, best, and most responsive to accept, at its option, any alternates and to approve the bond.
Bid Results
Sidewalks / Parking Lot
$86,960.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2026
June 5, 2026
1104 SW Walnut St, Lees Summit, MO
Related To This Project
Lees Summit, MO
Bid Date: May 20 2026
Lees Summit, MO
Bid Date: Jun 18 2026
Lees Summit, MO
Bid Date: May 15 2026
Lees Summit, MO
--
Lees Summit, MO
Bid Date: Jun 01 2026
Lees Summit, MO
--
Lees Summit, MO
--
Lees Summit, MO
--
Lees Summit, MO
Bid Date: Feb 10 2026
Lees Summit, MO
Bid Date: Feb 10 2026
Lees Summit, MO
--
Lees Summit, MO
--
Lees Summit, MO
Bid Date: Jan 20 2026
Lees Summit, MO
Bid Date: Jan 23 2026
Lees Summit, MO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
