Published May 11, 2026 at 8:00 PM
Updated May 15, 2026
Addition to an industrial development in Bloomington, Indiana. Completed plans call for the addition of a industrial development.
Electronic bids are requested for the IU 20181778 - BL411N N Woodlawn Chiller Plant Addition for the Trustees of Indiana University. A unified bid is required for all work on the project, including general, mechanical, and electrical construction. All bid proposals must comply fully with the bidding documents. Each bid must include a completed Minority, Women's and Veteran's Business Enterprise Participation Plan, a bid security for 5% of the total bid, and a written drug testing program compliant with Indiana Code 4-13-18. The owner reserves the right to accept or reject any bid and waive any irregularities. Bids may be held for up to sixty days before contract awards, while alternate bids may be held for up to ninety days before possible incorporation by change directive. Withdrawal or failure to execute a satisfactory contract within ten days of acceptance may result in bid security forfeiture as liquidated damages. A. Indiana University North Woodlawn is a chilled water plant that supplies chilled water to campus users. The plant has two (2) chillers and two (2) cooling tower cells but was originally designed for a future expansion to three (3) chillers and three (3) cooling tower cells. Indiana University desires to increase the capacity of the plant by installing a third chiller, third cooling tower cell, and associated pumps, piping and control equipment. B. Mechanical System Upgrade a. The existing chilled water system is a variable primary variable secondary system consisting of: (1) Two (2) variable speed chillers (2) Two (2) primary chilled water pumps (3) Two (2) secondary chilled water pumps (4) Two (2) condenser water pumps (5) Two (2) cooling tower cells (6) The total rated load of the existing system is 1500 tons. b. Contractor shall modify the system by installing the following equipment (supply as noted): (1) One (1) variable speed chiller, provided by Contractor. (2) One (1) primary chilled water pump, supplied by Contractor (3) One (1) condenser water pump, supplied by Contractor (4) One (1) cooling tower cell, supplied by Contractor. (5) The rated load of the new system will be 2300 tons
Bid Results
Industrial
$1,514,200.00
Public - State/Provincial
Addition
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.