Published May 11, 2026 at 8:00 PM

Updated May 15, 2026

Addition to an industrial development in Bloomington, Indiana. Completed plans call for the addition of a industrial development.

Electronic bids are requested for the IU 20181778 - BL411N N Woodlawn Chiller Plant Addition for the Trustees of Indiana University. A unified bid is required for all work on the project, including general, mechanical, and electrical construction. All bid proposals must comply fully with the bidding documents. Each bid must include a completed Minority, Women's and Veteran's Business Enterprise Participation Plan, a bid security for 5% of the total bid, and a written drug testing program compliant with Indiana Code 4-13-18. The owner reserves the right to accept or reject any bid and waive any irregularities. Bids may be held for up to sixty days before contract awards, while alternate bids may be held for up to ninety days before possible incorporation by change directive. Withdrawal or failure to execute a satisfactory contract within ten days of acceptance may result in bid security forfeiture as liquidated damages. A. Indiana University North Woodlawn is a chilled water plant that supplies chilled water to campus users. The plant has two (2) chillers and two (2) cooling tower cells but was originally designed for a future expansion to three (3) chillers and three (3) cooling tower cells. Indiana University desires to increase the capacity of the plant by installing a third chiller, third cooling tower cell, and associated pumps, piping and control equipment. B. Mechanical System Upgrade a. The existing chilled water system is a variable primary variable secondary system consisting of: (1) Two (2) variable speed chillers (2) Two (2) primary chilled water pumps (3) Two (2) secondary chilled water pumps (4) Two (2) condenser water pumps (5) Two (2) cooling tower cells (6) The total rated load of the existing system is 1500 tons. b. Contractor shall modify the system by installing the following equipment (supply as noted): (1) One (1) variable speed chiller, provided by Contractor. (2) One (1) primary chilled water pump, supplied by Contractor (3) One (1) condenser water pump, supplied by Contractor (4) One (1) cooling tower cell, supplied by Contractor. (5) The rated load of the new system will be 2300 tons

Bid Results

Industrial

$1,514,200.00

Public - State/Provincial

Addition

77

31

7

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

July 6, 2026

Project location map

1206 N Woodlawn Ave, Bloomington, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.