BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Demolition, site work, paving and new construction of a mixed-use development in Tacoma, Washington. Conceptual plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Pierce County Planning & Public Works - Office of the County Engineer Division (County) solicits interest from consulting firms with expertise in Civil and Structural Engineering Design. This agreement will be for approximately two years in duration, beginning September 2026 and ending September 2028, with the option for the County to extend it for additional time and money if necessary. The project involves the replacement of the Chamber Creek Bridge. The major features of the project are as follows: Roadway, parking lot, and bicycle/pedestrian improvements related to the new bridge, Demolition plan for the existing bridge, Structural design for the proposed bridge and walls required for the bridge abutments and roadway approaches, Stormwater collection and treatment facilities, Pedestrian crossing enhancements and roadway illumination requirements for new pedestrian crossings and parking to improve access to the adjacent Chambers Creek Canyon trail system, Utility design for the new bridge and temporary utility bypasses during construction, including preconstruction investigations and ongoing coordination with utility providers and jurisdictions during the design process, Environmental permitting and mitigation, Communication and engagement with tribes, interested parties, and the community, Determination of Right-of-Way needs and plan preparation, and Coordination with teams working on the other stages of the larger estuary restoration project. The project is estimated to be between 6 and 8.5 Million. Question Deadline 04/15/2026 at 4:00 PM PT All questions must be submitted within the County's eProcurement Portal. Consultants must be registered in the eProcurement Portal software in order to submit questions, receive addenda, notifications, and ultimately submit a proposal. The County reserves the right to accept or reject any or all submitted SOQs, and to waive as informalities any irregularities, and to contract as the best interest of the County may require. The County also may reject SOQs that are non-responsive or that are submitted by non-responsible firms The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Bridges / Tunnels

$8,500,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
87
Bidding Soon
1,093
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2026

Project location map

To be determined, Tacoma, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.