BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a bridge / tunnel in Sandisfield, Massachusetts. Completed plans call for site work for a bridge / tunnel.

Dodd Road Culvert Replacement over Unnamed Stream Work consists of removing two existing 18" HDPE culvert pipes and replacing them with a precast concrete box culvert. During construction, streamflow will be maintained through temporary diversion or bypass pumping. Stone headwalls on both ends of the culvert will also be removed and disposed of. Bids shall be on a lump sum basis as indicated in the Bid Form.

Post-Bid

Bridges / Tunnels

$325,000.00

Public - City

Site Work

13

8

4

8

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
673
Active Projects
341
Bidding Soon
3,076
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2026

June 12, 2026

Project location map

Dodd Rd, Sandisfield, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.